Side, drop and frontal intakes

Short answer

Side intake: opening in the river bank at 90-110° to flow, used where bed load and boulders exist, common in Nepal. Drop intake: inclined rack across the stream bed, used in steep mountain streams with coarse bed load. Frontal intake: opening in line with flow, simple but admits bed load, used only for clean water.

Explain the usage of side intake, drop intake and frontal intake with sketches.

1. Side intake

The opening is made in the river bank, at an angle (normally 90-110°) to the flow, beside the weir. It has a sill, a trash rack and a gate.

 river ==========================>
        weir crest  ||||||||||||||
 bank   +----------------------+
   rack |  intake    gate  -----+--> canal
  • Used where the river carries bed load and boulders: the sill is raised and the undersluice keeps the intake clear. It is the most common type in Nepal's RoR plants (steep gravel-boulder rivers).
  • The flow must turn through about 90°, so some sediment still enters; a gravel trap is therefore needed.

2. Drop (bottom / Tyrolean) intake

A trench with inclined bars (a rack) is built in the river bed across the flow; the water drops through the bars into a chamber and flows on into a pipe or canal.

 flow ====>   inclined rack
        ______\\\\\\\\\\______
              |  chamber  |---> conduit
  • Used in steep mountain streams with small flow and coarse bed load, where the boulders roll over the rack.
  • The collection chamber lies below the river bed, so some head is lost; the rack lets fine sediment through, so a settling basin is needed downstream. It is liable to clogging by leaves and gravel and needs regular cleaning.
  • Not suited to a large discharge.

3. Frontal intake

The opening is placed in line with the flow (in the weir or the dam face).

 river ===> |intake| ----> conduit
  • Entry losses are small and the structure is simple, but it takes in much of the bed load, so it is used only where the water is clean (e.g. a reservoir or a clean channel) or with a good sediment excluder in front.

✓ Answer checked by Claude Opus 5.5 (high effort)