Skip to main content

AASHTO design: find initial commercial vehicles

Short answer

SN=3.18, solving AASHTO equation gives W18=900,251 ESALs. With growth factor 13.181 (10 yr, 6%), VDF=2.5, lane factor 0.5, opening traffic is 150 CVPD; back-casting 2 yr construction at 6% yields initial 133 CVPD at survey.

The flexible pavement was designed for two lane two way road as shown in figure. The drainage coefficient for base layer is 1, layer coefficient for surface and base layer are α1 = 0.323 log10 E1 − 1.42, and α2 = 0.249 log10 E2 − 0.977, where E1 and E2 are in PSi. Determine the initial commercial vehicle per day, the road was designed for. Traffic growth rate = 6%, construction period = 2 yrs, design life = 10 yrs, VDF = 2.5.

[Figure: HMA surface of thickness 5.3 in with E1 = 365 ksi on a base of thickness 8.6 in with E2 = 30 ksi, over subgrade with E3 = 9 ksi]

Given and assumptions

Surface 5.3 in (E1=365E_1=365 ksi), base 8.6 in (E2=30E_2=30 ksi, m2=1m_2=1), subgrade E3=9E_3=9 ksi =MR=9000=M_R=9000 psi. Reliability, standard deviation and ΔPSI\Delta PSI are not given for this part; the values of the companion problem are used: R=90%R=90\% (ZR=−1.282Z_R=-1.282), S0=0.5S_0=0.5, ΔPSI=2.0\Delta PSI=2.0. Two-lane two-way road: design lane carries 50 percent of the total.

Step 1 - Layer coefficients and SN

a1=0.323log⁡10(365000)−1.42=0.377a2=0.249log⁡10(30000)−0.977=0.138SN=a1D1+a2D2m2=0.377×5.3+0.138×8.6×1=3.18\begin{aligned} a_1&=0.323\log_{10}(365000)-1.42=0.377\\ a_2&=0.249\log_{10}(30000)-0.977=0.138\\ SN&=a_1D_1+a_2D_2m_2=0.377\times5.3+0.138\times8.6\times1=3.18 \end{aligned}

Step 2 - ESALs the section can carry (AASHTO-93)

log⁡10W18=ZRS0+9.36log⁡10(SN+1)−0.20+log⁡10[ΔPSI/2.7]0.4+1094/(SN+1)5.19+2.32log⁡10MR−8.07\log_{10}W_{18}=Z_RS_0+9.36\log_{10}(SN+1)-0.20+\frac{\log_{10}[\Delta PSI/2.7]}{0.4+1094/(SN+1)^{5.19}}+2.32\log_{10}M_R-8.07

Substituting SN=3.18SN=3.18, MR=9000M_R=9000: log⁡10W18=5.954\log_{10}W_{18}=5.954, so W18=900251W_{18}=900251 ESALs.

Step 3 - Initial commercial vehicles per day

Growth factor for 10 years at 6 percent: (1.06)10−10.06=13.181\dfrac{(1.06)^{10}-1}{0.06}=13.181.

W18=365×A×0.5×VDF×GF ⇒ A=900251365×0.5×2.5×13.181=149.7 CVPDW_{18}=365\times A\times0.5\times VDF\times GF \ \Rightarrow\ A=\frac{900251}{365\times0.5\times2.5\times13.181}=149.7\ \text{CVPD}

This is the traffic in the year the road opens. The construction period is 2 years, so the traffic counted at the start is

A0=149.7(1.06)2=133.2 CVPDA_0=\frac{149.7}{(1.06)^2}=133.2\ \text{CVPD}

Answer: the pavement was designed for an initial traffic of about 133 commercial vehicles per day (at the time of the survey), which grows to about 150 CVPD at opening.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Transportation Engineering II chapter 2 questions →