Asphalt Institute design: 1850 ESA/day four lane

Short answer

Using Asphalt Institute method with CBR 5% subgrade (Mr=50 MPa), design ESAL 7.64E+6. Layer thicknesses: 100 mm asphalt concrete (a1=0.376), 160 mm bituminous base (a2=0.328), 260 mm granular sub-base (a3=0.128). Total 520 mm.

Design a flexible pavement by using asphalt institute method from the following data of a stretch of existing four lane divided carriageway,

  • Current traffic (sum of both direction) = 1850 esa per day
  • Traffic growth rate = 6%
  • Design period = 15 years
  • Construction period = 16 months
  • The load at 2.5 mm and 5 mm penetration during CBR test on subgrade soil is 68.5 kg and 80 kg respectively
  • Elastic modulus of asphalt concrete surface course, bituminous treated base and granular sub-base course are 2,500 MPa, 1,200 MPa and 125 MPa respectively.

Given data and assumptions

  • Current traffic (both directions) 1850 ESA/day, growth 6 %, design period 15 years, construction period 16 months (1.33 years).
  • Four-lane divided carriageway: the design lane carries 45 percent of the total two-way traffic (AI lane factor for 4 lanes).
  • Moduli: asphalt concrete 2500 MPa, bituminous treated base 1200 MPa, granular sub-base 125 MPa.
  • Method: Asphalt Institute (AI) layered thickness design as taught for IOE (and used in the Nepal DoR Pavement Design Guidelines); design reliability 90 percent, terminal serviceability 2.5.

Step 1 - Subgrade strength

CBR at 2.5 mm = 68.51370×100=5.00 %\frac{68.5}{1370}\times100=5.00\ \%; CBR at 5.0 mm = 802055×100=3.89 %\frac{80}{2055}\times100=3.89\ \% (standard loads 1370 kg and 2055 kg). The 2.5 mm value is higher, so CBR = 5.0 % is adopted.

Resilient modulus of the subgrade: MR=10×CBR=10×5.0=50M_R = 10\times CBR = 10\times 5.0 = 50 MPa.

Step 2 - Design traffic (ESAL)

Traffic at opening: 1850×0.45×(1.06)1.33=899.81850\times0.45\times(1.06)^{1.33} = 899.8 ESA/day (design lane).

ESAL=365×899.8×(1.06)15−10.06=365×899.8×23.276=7.644×106\begin{aligned} ESAL &= 365\times 899.8 \times \frac{(1.06)^{15}-1}{0.06} \\ &= 365\times899.8\times23.276 = 7.644\times10^6 \end{aligned}

Design ESAL = 7.644 ×106\times 10^6

Step 3 - Thickness required over each layer

The AI charts give the thickness of asphalt concrete (full depth) needed to protect a layer of a given modulus for the design ESAL. Here the same requirement is expressed as a structural number SNSN (AASHTO-93 relation with R = 90 percent, S0S_0 = 0.45, ΔPSI\Delta PSI = 1.7), which approximates the chart readings. If the AI chart is supplied in the exam, read the thickness from it and use the same layer steps below.

Protected layerModulus (MPa)Required SNFull-depth AC equivalent, SN/a1a_1 (mm)
Bituminous treated base12001.4296
Granular sub-base1253.47234
Subgrade504.82326

Step 4 - Layer coefficients

Using a1=0.323log⁡10E−1.42a_1=0.323\log_{10}E-1.42, a2=0.249log⁡10E−0.977a_2=0.249\log_{10}E-0.977, a3=0.227log⁡10E−0.839a_3=0.227\log_{10}E-0.839 with EE in psi:

  • Asphalt concrete (2500 MPa): a1=0.376a_1 = 0.376
  • Bituminous treated base (1200 MPa): a2=0.328a_2 = 0.328
  • Granular sub-base (125 MPa): a3=0.128a_3 = 0.128

Step 5 - Layer thicknesses

  • Asphalt concrete: D1≥SNbase/a1=1.42/0.376=3.78D_1 \ge SN_{base}/a_1 = 1.42/0.376 = 3.78 in =96= 96 mm, so provide 100 mm (minimum 50 mm). SN1=1.48SN_1 = 1.48.
  • Bituminous treated base: D2≥(SNsub−SN1)/a2=(3.47−1.48)/0.328=6.07D_2 \ge (SN_{sub}-SN_1)/a_2 = (3.47-1.48)/0.328 = 6.07 in =154= 154 mm, so provide 160 mm. SN2=2.07SN_2 = 2.07.
  • Granular sub-base: D3≥(SNsg−SN1−SN2)/a3=(4.82−1.48−2.07)/0.128=9.92D_3 \ge (SN_{sg}-SN_1-SN_2)/a_3 = (4.82-1.48-2.07)/0.128 = 9.92 in =252= 252 mm, so provide 260 mm. SN3=1.31SN_3 = 1.31.

Check: provided SN=1.48+2.07+1.31=4.86≥4.82SN = 1.48+2.07+1.31 = 4.86 \ge 4.82 (required) - safe.

Answer: asphalt concrete 100 mm, bituminous treated base 160 mm, granular sub-base 260 mm; total pavement thickness = 520 mm.

   +-------------------------------------+
   | Asphalt concrete             100 mm |
   +-------------------------------------+
   | Bituminous treated base      160 mm |
   +-------------------------------------+
   | Granular sub-base            260 mm |
   +-------------------------------------+
   | Subgrade, CBR 5.0 %                 |
   +-------------------------------------+