Asphalt Institute design: 1500 pcu/day, 5% growth

Short answer

Design ESAL = 15.889 × 10⁶ using Asphalt Institute method with subgrade MR = 50 MPa. Required layer thicknesses: asphalt concrete 110 mm, bituminous treated base 180 mm, granular sub-base 280 mm; total pavement thickness 570 mm.

Design a flexible pavement by using Asphalt Institute Method for a two lane two way pavement carrying traffic of 1500pcu/day with growth rate of traffic 5% per annum. The design life is 15 years. The vehicle damage factor is 2.5 and CBR value of sub grade soil is 5%. The modulus of asphalt concrete surface course, bituminous treated base course and granular sub-base course are 2500MPa, 1200MPa and 125 MPa respectively. Assume construction period of 18 months. Draw a neat sketch of pavement layers.

Given data and assumptions

  • Two-lane two-way road; traffic 1500 pcu/day (all taken as commercial vehicles of damage factor 2.5), growth 5 %, design life 15 years, construction period 18 months (1.5 years), subgrade CBR 5 %.
  • Moduli: asphalt concrete 2500 MPa, bituminous treated base 1200 MPa, granular sub-base 125 MPa.
  • Design lane carries 50 percent of the two-way traffic (Asphalt Institute, two lanes).
  • Method: Asphalt Institute (AI) thickness design as taught for IOE (and used in the Nepal DoR Pavement Design Guidelines); design reliability 90 percent, terminal serviceability 2.5.

Step 1 - Subgrade strength

Subgrade CBR is given as 5 %.

Resilient modulus of subgrade: MR=10×CBR=10×5.0=50M_R = 10\times CBR = 10\times 5.0 = 50 MPa.

Step 2 - Design traffic (ESAL)

ESAL/day now (design lane) =1500×2.5×0.5=1875=1500\times2.5\times0.5=1875. At opening: 1875×(1.05)1.5=2017.41875\times(1.05)^{1.5}=2017.4 per day.

ESAL=365×2017.4×(1.05)15−10.05=365×2017.4×21.579=15.889×106ESAL=365\times2017.4\times\frac{(1.05)^{15}-1}{0.05}=365\times2017.4\times21.579=15.889\times10^6

Design ESAL = 15.889 ×106\times 10^6

Step 3 - Thickness required over each layer

The AI charts give the thickness of asphalt concrete (full depth) needed to protect a layer of a given modulus for the design ESAL. The same requirement is expressed here as a structural number SNSN (AASHTO-93 relation with R = 90 percent, S0S_0 = 0.45, ΔPSI\Delta PSI = 1.7), which closely approximates the AI chart readings (if the chart is supplied in the exam, read the thickness from it and use the same layer-coefficient steps below).

Protected layerModulus (MPa)Required SNFull-depth AC equivalent at a1=0.44a_1=0.44 (mm)
bituminous treated base12001.6294
granular sub-base1253.90225
Subgrade505.35309

Step 4 - Layer coefficients

Using a1=0.323log⁡10E−1.42a_1=0.323\log_{10}E-1.42, a2=0.249log⁡10E−0.977a_2=0.249\log_{10}E-0.977, a3=0.227log⁡10E−0.839a_3=0.227\log_{10}E-0.839 with EE in psi:

  • Asphalt concrete (2500 MPa): a1=0.376a_1 = 0.376
  • bituminous treated base (1200 MPa): a2=0.328a_2 = 0.328
  • granular sub-base (125 MPa): a3=0.128a_3 = 0.128

Step 5 - Layer thicknesses

  • Asphalt concrete: D1≥SNbase/a1=1.62/0.376=110D_1 \ge SN_{base}/a_1 = 1.62/0.376=110 mm, so provide 110 mm (minimum 50 mm). SN1=1.63SN_1 = 1.63.
  • Bituminous treated base: D2≥(SNsub−SN1)/a2=(3.90−1.63)/0.328=176D_2 \ge (SN_{sub}-SN_1)/a_2 = (3.90-1.63)/0.328 = 176 mm, so provide 180 mm. SN2=2.32SN_2 = 2.32.
  • Granular sub-base: D3≥(SNsg−SN1−SN2)/a3=(5.35−1.63−2.32)/0.128=279D_3 \ge (SN_{sg}-SN_1-SN_2)/a_3 = (5.35-1.63-2.32)/0.128 = 279 mm, so provide 280 mm. SN3=1.41SN_3 = 1.41.

Check: provided SN=1.63+2.32+1.41=5.36≥5.35SN = 1.63+2.32+1.41 = 5.36 \ge 5.35 (required) - safe.

Answer: asphalt concrete 110 mm, bituminous treated base 180 mm, granular sub-base 280 mm; total pavement thickness = 570 mm.

   +-------------------------------------+
   | Asphalt concrete             110 mm |
   +-------------------------------------+
   | Bituminous treated base      180 mm |
   +-------------------------------------+
   | Granular sub-base            280 mm |
   +-------------------------------------+