- 2066 Bhadra · 10 marks
Asphalt Institute design: 1.888×10³ ESAL/day, 10 years
Short answer
Use CBR 5% giving Mr=50 MPa; design ESAL=9.913e6. Required SNs are 2.77 for base, 3.62 for subbase, 5.01 for subgrade. Layer coefficients give asphalt concrete 205 mm, crushed stone base 140 mm, granular sub-base 270 mm, total 615 mm.
An existing single lane gravel road has to be upgraded by bituminous pavement for a specified length as it is the demand for catering the increment in volume of heavy traffic. In order to estimate the base traffic, traffic survey was carried out at two points on the existing roads. The pavement design is based on the following assumptions. i) Base traffic of 82 kN equivalent single axle load (ESAL) = 1.888×10³ ESAL per day ii) Design period = 10 years iii) Construction period = 18 months iv) Growth rate = 6% v) 87.5 percentile CBR value of sub-grade soil from 7 sample locations = 5% vi) Elastic modulus of asphalt concrete for surface course Eac = 2000 MPa vii) Elastic modulus of crushed stone base Ebase = 250 MPa viii) Elastic modulus of granular sub-base Esubbase = 125 MPa You are asked to design the pavement by Asphalt Institute Method. Draw the cross section of final pavement layers considering the minimum thickness of asphalt concrete on surface course is equal to 50 mm. Chart is provided.
Given data and assumptions
- Single-lane gravel road upgraded to bituminous; base traffic 1.888 x 10^3 (1888) ESAL/day (the figure is already in equivalent standard axles; the 82 kN axle is taken as the standard axle of about 80 kN / 8.2 t, so the value is used directly), growth 6 %, design period 10 years, construction period 18 months (1.5 years).
- 87.5th percentile CBR = 5 %; moduli: asphalt concrete 2000 MPa, crushed stone base 250 MPa, granular sub-base 125 MPa.
- Single lane: design lane factor 1.0 (the survey figure is assumed to be the total on the lane). Minimum asphalt concrete 50 mm.
- Method: Asphalt Institute (AI) thickness design as taught for IOE (and used in the Nepal DoR Pavement Design Guidelines); design reliability 90 percent, terminal serviceability 2.5.
Step 1 - Subgrade strength
The design (87.5th percentile) CBR of the subgrade is given as 5 %.
Resilient modulus of subgrade: MPa.
Step 2 - Design traffic (ESAL)
ESAL/day at opening .
Design ESAL = 9.913
Step 3 - Thickness required over each layer
The AI charts give the thickness of asphalt concrete (full depth) needed to protect a layer of a given modulus for the design ESAL. The same requirement is expressed here as a structural number (AASHTO-93 relation with R = 90 percent, = 0.45, = 1.7), which closely approximates the AI chart readings (if the chart is supplied in the exam, read the thickness from it and use the same layer-coefficient steps below).
| Protected layer | Modulus (MPa) | Required SN | Full-depth AC equivalent at (mm) |
|---|---|---|---|
| crushed stone base | 250 | 2.77 | 160 |
| granular sub-base | 125 | 3.62 | 209 |
| Subgrade | 50 | 5.01 | 289 |
Step 4 - Layer coefficients
Using , , with in psi:
- Asphalt concrete (2000 MPa):
- crushed stone base (250 MPa):
- granular sub-base (125 MPa):
Step 5 - Layer thicknesses
- Asphalt concrete: mm, so provide 205 mm (minimum 50 mm). .
- Crushed stone base: mm, so provide 140 mm. .
- Granular sub-base: mm, so provide 270 mm. .
Check: provided (required) - safe.
Answer: asphalt concrete 205 mm, crushed stone base 140 mm, granular sub-base 270 mm; total pavement thickness = 615 mm.
+-------------------------------------+
| Asphalt concrete 205 mm |
+-------------------------------------+
| Crushed stone base 140 mm |
+-------------------------------------+
| Granular sub-base 270 mm |
+-------------------------------------+
| Subgrade, CBR 5.0 % |
+-------------------------------------+
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Asphalt Institute design: 5.11×10⁴ ESAL/year, 12 years · Transportation Engineering II, chapter 2
- Asphalt Institute design: gravel road upgrade, 0.8×10³ ESA · Transportation Engineering II, chapter 2
- Asphalt Institute design: 1850 ESA/day four lane · Transportation Engineering II, chapter 2
- Asphalt Institute design: 0.95×10³ EAL/day · Transportation Engineering II, chapter 2
- Asphalt Institute design: 1500 pcu/day, 5% growth · Transportation Engineering II, chapter 2
- Flexible design: 4-lane single carriageway, 2000 CVPD · Transportation Engineering II, chapter 2