- 2068 Baisakh · 8 marks
Asphalt Institute design: gravel road upgrade, 0.8×10³ ESA
Short answer
Subgrade Mr = 50 MPa. Design lane ESAL = 800×0.5×1.065×365×[(1.065^10-1)/0.065] = 2.098×10^6. Asphalt concrete 140 mm, crushed stone base 100 mm, granular sub-base 170 mm (total 410 mm).
An existing two lane single carriageway gravel road has to be upgraded by bituminous pavement, to cater the growing traffic demand. Present traffic in terms of ESA is 0.8 × 10³ per day. The regional traffic growth rate is taken as 6.5% per annum. Data required for pavement design are as given below. i) Design period = 10 years ii) Construction period = 1 year iii) 87.5 percentile CBR value of sub grade soil from 7 sample locations = 5% iv) Elastic modulus of asphalt concrete for surface course Eac = 2000 MPa v) Elastic modulus of crushed stone base Ebase = 350 MPa vi) Elastic modulus of granular sub-base Esub-base = 250 MPa You are required to design the pavement by Asphalt Institute Method. Draw the cross section of final pavement layers considering the minimum thickness of asphalt concrete on surface course equal to 50 mm.
Given data and assumptions
- Two-lane single carriageway gravel road upgraded to bituminous; present traffic 0.8 x 10^3 (800) ESA/day (both directions), growth 6.5 %, design period 10 years, construction period 1 year.
- 87.5th percentile subgrade CBR = 5 %; moduli: asphalt concrete 2000 MPa, crushed stone base 350 MPa, granular sub-base 250 MPa.
- Two lanes: design lane carries 50 percent of the total (Asphalt Institute). Minimum asphalt concrete 50 mm.
- Method: Asphalt Institute (AI) thickness design as taught for IOE (and used in the Nepal DoR Pavement Design Guidelines); design reliability 90 percent, terminal serviceability 2.5.
Step 1 - Subgrade strength
The design (87.5th percentile) CBR of the subgrade is given as 5 %.
Resilient modulus of subgrade: MPa.
Step 2 - Design traffic (ESAL)
Design-lane ESA/day at opening .
Design ESAL = 2.098
Step 3 - Thickness required over each layer
The AI charts give the thickness of asphalt concrete (full depth) needed to protect a layer of a given modulus for the design ESAL. The same requirement is expressed here as a structural number (AASHTO-93 relation with R = 90 percent, = 0.45, = 1.7), which closely approximates the AI chart readings (if the chart is supplied in the exam, read the thickness from it and use the same layer-coefficient steps below).
| Protected layer | Modulus (MPa) | Required SN | Full-depth AC equivalent at (mm) |
|---|---|---|---|
| crushed stone base | 350 | 1.87 | 108 |
| granular sub-base | 250 | 2.14 | 124 |
| Subgrade | 50 | 3.96 | 229 |
Step 4 - Layer coefficients
Using , , with in psi:
- Asphalt concrete (2000 MPa):
- crushed stone base (350 MPa):
- granular sub-base (250 MPa):
Step 5 - Layer thicknesses
- Asphalt concrete: mm, so provide 140 mm (minimum 50 mm). .
- Crushed stone base: mm, so provide 100 mm. .
- Granular sub-base: mm, so provide 170 mm. .
Check: provided (required) - safe.
Answer: asphalt concrete 140 mm, crushed stone base 100 mm, granular sub-base 170 mm; total pavement thickness = 410 mm.
+-------------------------------------+
| Asphalt concrete 140 mm |
+-------------------------------------+
| Crushed stone base 100 mm |
+-------------------------------------+
| Granular sub-base 170 mm |
+-------------------------------------+
| Subgrade, CBR 5.0 % |
+-------------------------------------+
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Asphalt Institute design: 1850 ESA/day four lane · Transportation Engineering II, chapter 2
- Asphalt Institute design: 1.888×10³ ESAL/day, 10 years · Transportation Engineering II, chapter 2
- Asphalt Institute design: 5.11×10⁴ ESAL/year, 12 years · Transportation Engineering II, chapter 2
- Asphalt Institute design: 0.95×10³ EAL/day · Transportation Engineering II, chapter 2
- Flexible design: 4-lane single carriageway, 2000 CVPD · Transportation Engineering II, chapter 2
- Asphalt Institute design: 1500 pcu/day, 5% growth · Transportation Engineering II, chapter 2
- Setback on four lane carriageway, 400 m radius · Transportation Engineering I, chapter 3