- 2077 Chaitra · 4 marks
Detailed specification of cement plaster 1:4
Short answer
Cement plaster1:4,12 mm average thickness on brick wall. Mortar used within30 min; surface prepared by raking jointes12–15 mm and wetting. Applied between screeds, finished with wooden float. Curing7 days. Measured in m², with opening deductions per rule.
Write a detailed specification of cement plaster of 1:4 in brick wall.
Detailed specification: 12 mm cement plaster 1:4 on brick wall
Scope: Providing and applying cement sand plaster 1:4 (1 cement : 4 sand) of 12 mm average thickness on brick walls (internal/external), complete with curing, as per drawings.
Materials
- Cement: OPC 43 grade/PPC, fresh.
- Sand: clean river sand, free from silt, clay, organic matter and salts; passing a 2.36 mm sieve, FM about 1.5–2.0.
- Water: clean, potable.
Mortar: 1 : 4 by volume, mixed to a uniform consistency and used within 30 minutes; no re-tempering.
Surface preparation
- Brick joints are raked to a depth of 12–15 mm, and the surface is cleaned of dust, efflorescence and loose mortar.
- The wall is wetted thoroughly (but not saturated) a few hours before plastering.
- The masonry should have settled, and pipes and electrical conduits are fixed first.
Application
- Level guide strips (screeds) of mortar, 15 cm wide, are fixed at about 2 m intervals, truly plumb and in the same plane.
- Mortar is thrown on firmly and pressed into the joints, filled between the screeds, and levelled with a straight-edge (a flat wooden rule).
- The surface is finished with a wooden float to a uniform, even surface; for a smooth finish, a thin coat of neat cement slurry (punning) may be applied with a steel trowel.
- Plaster is applied from the top downward, and at the end of each day the work is cut clean and straight. Edges and corners are finished plumb and square.
- External plaster in one panel is done without joints; where a joint is unavoidable, it is placed at a corner or a groove.
Curing: Kept moist for at least 7 days and protected from sun, wind and rain.
Tolerance: thickness not less than 10 mm at any point; the surface should not deviate more than 3 mm under a 2 m straight-edge.
Measurement and payment: measured in square metres of finished surface. For a wall plastered on both faces: openings up to 0.5 m² are not deducted (and jambs are not added); openings of 0.5–3 m² are deducted from one face only (jambs not added); openings over 3 m² are deducted from both faces, and jambs, soffits and sills are measured. The rate includes materials, scaffolding, curing and labour.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Detailed specification of brick work in 1:4 mortar · Construction Management, chapter 12 · asked 5×
- Detailed specification of brick work in 1:6 mortar · Construction Management, chapter 12 · asked 5×
- Detailed specification of cement sand mortar 1:4 · Construction Management, chapter 12 · asked 2×
- Detailed specification of cement sand mortar 1:6 · Construction Management, chapter 12 · asked 2×
- Types of specification: general and detailed · Construction Management, chapter 12 · asked 7×
- Detailed specification of RCC M20 column · Construction Management, chapter 12
- Thermal resistance of brick wall with plaster · Fundamental of Thermodynamics & Heat Transfer, chapter 7
- Building: excavation, brick, paneled door, plaster · Estimating and Costing, chapter 6
- Load bearing building: excavation, brick, plaster · Estimating and Costing, chapter 6
- Building: excavation, brick, plaster (18 marks) · Estimating and Costing, chapter 6