- Asked 5/19
- 2069 Bhadra (old course) · 4 marks
Detailed specification of brick work in 1:6 mortar
Short answer
Brick work with first-class bricks (240×115×57 mm) in 1:6 cement-sand mortar, joints max 12 mm thick, raked 12–15 mm. Mortar used within 30 min, curing 7 days. Measured in m³ of finished work.
Write a detailed specification of brick work in 1:6 cement sand mortar.
Detailed specification: brick work in cement sand mortar 1:6
Scope: Providing and constructing brick masonry in cement sand mortar 1:6 (1 cement : 6 sand by volume) for walls above plinth, including scaffolding, curing and cleaning, as per drawings and the engineer's instructions.
Materials
- Bricks: first-class, well burnt, regular in shape (240 × 115 × 57 mm), uniform in colour, giving a ringing sound when struck; compressive strength as specified (first-class bricks normally not less than about 10 N/mm², and never below the NBC minimum of 3.5 N/mm²); water absorption not more than 20%; no cracks or lime lumps. Soaked in water for at least 2 hours before laying.
- Cement: OPC 43 or PPC, fresh, free of lumps, kept in a dry store.
- Sand: clean, coarse river or pit sand, free from clay, silt (< 4%), organic matter and salt; FM 1.5–2.5.
- Water: clean and potable.
Mortar: cement and sand 1:6 by volume (gauge boxes), dry-mixed until uniform in colour, then mixed with just enough water. Mortar must be used within 30 minutes of mixing; it must not be re-tempered.
Workmanship
- Brickwork in the bond shown (English or Flemish); full bed of mortar, all joints filled.
- Joint thickness 10 mm (max. 12 mm); face joints raked 12–15 mm deep for plastering.
- Courses level and plumb, checked by line, plumb bob and spirit level; vertical joints staggered.
- Raising limited to 1 m per day; where work stops, it is raked back (stepped) according to the bond, with toothing only where future extension is planned.
- Openings left, and lintels and sleeves placed, as per drawing; bearings for slabs/beams finished flat.
Curing: keep wet for at least 7 days; protect fresh work from rain and sun.
Tolerance: plumb within 5 mm per 3 m height.
Measurement and payment: measured in cubic metres of finished work; openings over 0.1 m² deducted. The rate includes all materials, labour, scaffolding, curing and wastage.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Detailed specification of brick work in 1:4 mortar · Construction Management, chapter 12 · asked 5×
- Detailed specification of cement sand mortar 1:4 · Construction Management, chapter 12 · asked 2×
- Detailed specification of cement sand mortar 1:6 · Construction Management, chapter 12 · asked 2×
- Detailed specification of cement plaster 1:4 · Construction Management, chapter 12
- Detailed specification of stone masonry in 1:6 mortar · Construction Management, chapter 12
- Types of specification: general and detailed · Construction Management, chapter 12 · asked 7×
- Detailed specification of RCC M20 column · Construction Management, chapter 12
- Mortar properties; cement and sand for 10 cum · Building Technology, chapter 3
- Well foundation: sinking, brick, sand filling, PCC · Estimating and Costing, chapter 6 · asked 2×
- Building: excavation, brick 1:4, wood work · Estimating and Costing, chapter 6
- Building: excavation, PCC, brick, wood work · Estimating and Costing, chapter 6