- Asked 2/19
- 2075 Bhadra · 6 marks
Value of a 20-year-old building
Short answer
Land value Rs2,50,00,000; building replacement cost Rs2,50,00,000. With 80-year life, 10% scrap, straight-line depreciation for 20 years is Rs56,25,000, so building value Rs1,93,75,000; total property value Rs4,43,75,000.
Calculate the value of a building built 20 years ago having plinth area 500 sqm, constructed in the land of 1000 sqm. Current market value of the land is Rs. 25000 per sqm and rate of building is Rs. 50,000 per sqm. Assume suitable data if necessary.
Assumptions: RCC building with a total life of 80 years; scrap value = 10% of the cost; straight-line depreciation (an alternative: sinking fund method). Rate of building (Rs 50,000/m²) is the present cost of construction.
Land = 1000 × 25,000 = Rs 2,50,00,000
Present cost of building = 500 × 50,000 = Rs 2,50,00,000
Depreciation (straight line)
Present value of building = 2,50,00,000 − 56,25,000 = Rs 1,93,75,000
Value of property = land + building = 2,50,00,000 + 1,93,75,000 = Rs 4,43,75,000
Answer: Value of the property is about Rs 4.44 crore (Rs 4,43,75,000).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Value of a 10-year-old building · Construction Management, chapter 13 · asked 2×
- Capitalized value of 80-year building · Construction Management, chapter 13
- Job layout for 1000 sqm public building · Construction Management, chapter 6
- Fair market value of Tata Sipradi showroom · Construction Management, chapter 13
- Loan value against mortgage of a building · Construction Management, chapter 13
- Capitalized value of three-storied RCC building · Construction Management, chapter 13
- Capitalised value from Rs 20,000 monthly rent · Construction Management, chapter 13
- Channel earthwork and land area, 50 cm fall · Estimating and Costing, chapter 6 · asked 2×
- Gumbel 500-year flood, 95% limits, 30 years · Engineering Hydrology, chapter 6
- Dividend per ordinary share, 500 shares, tax 20% · Project Engineering, chapter 6
- EVA; 10 days, 50 labour days at Rs 1000 · Project Engineering, chapter 4 · asked 2×