Temporary overvoltage for SLG fault at line end
Short answer
Use long-line Ferranti rise and sequence network with Z0=Z1+3Zn; prefault open-end voltage is 1.0845 pu and earth-fault factor is 1.169. Healthy-phase TOV is 1.268 pu, about 293 kV rms to ground, roughly 414 kV peak.
A 400 kV high voltage transmission line has resistance = 0.031 Ω/km, inductance = 1 mH/km and capacitance = 10 nF/km. Compute the temporary over voltage due to single line to ground fault if the fault is at the end of the 400 km long line. Consider the line resistance and generator neutral impedance of 5 + j50 Ω. Neglect fault impedance.
A single line-to-ground (SLG) fault raises the power-frequency voltage of the healthy phases. On an unloaded long line it is raised further by the Ferranti effect. The result is a temporary overvoltage (TOV).
Method and assumptions (data not given are taken as below and stated):
- Generator emf pu (phase), with the generator's own sequence impedances neglected (not given).
- Prefault voltage at the fault point is found from the long-line equation with the far end open (Ferranti rise):
where is the distance of the fault from the source. 3. Positive- and negative-sequence impedance up to the fault: . 4. Zero-sequence impedance . No separate zero-sequence line data are given, so the line's is taken equal to , and is the generator neutral impedance.
Healthy-phase voltage for an SLG fault on phase through :
Data: /km, mH/km, nF/km, length 400 km, fault at the far end ( km), , . Line resistance is included, as asked.
Step 1: line constants
Step 2: prefault voltage at the open end (Ferranti)
Step 3: sequence impedances up to the fault
Step 4: healthy-phase voltages
Step 5: temporary overvoltage
| Quantity | Value |
|---|---|
| Ferranti factor at the open end | 1.0845 |
| (magnitude) | 2.19 |
| Earth-fault factor | 1.169 |
| TOV on healthy phase | 1.268 pu ≈ 292.7 kV rms |
Gen ~--[ 400 km line ]--x SLG at far end
| (phase a)
Zn = 5+j50 ohm
|
gnd
Answer: the temporary overvoltage on the healthy phases ≈ 1.27 pu (≈ 293 kV rms to ground, peak ≈ 414 kV). This is the Ferranti rise (1.085) multiplied by the earth-fault factor (1.169). Since here, the system behaves as effectively grounded (earth-fault factor below 1.4).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Temporary overvoltage for SLG fault at line middle · High Voltage Engineering, chapter 3
- Surge impedance and travel time of 400 km line · High Voltage Engineering, chapter 3
- Capacitance matrix of 400 kV bundled line · High Voltage Engineering, chapter 5 · asked 2×
- Healthy-phase overvoltage in SLG fault; effective grounding · High Voltage Engineering, chapter 3
- Temporary overvoltage at no load and its remedy · High Voltage Engineering, chapter 3
- Surge impedance and velocity of 220 kV line · High Voltage Engineering, chapter 3 · asked 2×
- 450 km 400 kV line, 420 MW, 0.9 pf · Power System Analysis I, chapter 5
- Voltage 150 km along a 400 km line · Power System Analysis I, chapter 5
- 110 km, 110 kV line: sending end, regulation, efficiency · Power System Analysis I, chapter 6 · asked 2×
- Restriking voltage numerical (11 kV, 10 mH) · Switchgear and Protection, chapter 6 · asked 2×