- 2067 Mangsir (old course) · 12 marks
Temporary overvoltage for SLG fault at line middle
Short answer
Prefault voltage at midpoint rises to 1.0707 pu by Ferranti effect. With generator grounding impedance 4+j50 Ω and fault impedance j35 Ω, the earth-fault factor is 1.204. The temporary overvoltage on healthy phases is 1.29 pu (≈298 kV rms phase-to-ground).
Compute the temporary over voltage due to single line to ground fault for a 400 kV, 50 Hz, 3 phase, AC transmission line having r = 0.04 Ω/km, l = 1.01 mH/km and C = 11 nF/km if the fault is at the middle of the line. Take fault impedance of j35 Ω, generator grounding impedance 4 + j50 Ω. Take length of line = 400 km.
A single line-to-ground (SLG) fault raises the power-frequency voltage of the healthy phases. On an unloaded long line it is raised further by the Ferranti effect. The result is a temporary overvoltage (TOV).
Method and assumptions (data not given are taken as below and stated):
- Generator emf pu (phase), with the generator's own sequence impedances neglected (not given).
- Prefault voltage at the fault point is found from the long-line equation with the far end open (Ferranti rise):
where is the distance of the fault from the source. 3. Positive- and negative-sequence impedance up to the fault: . 4. Zero-sequence impedance . No separate zero-sequence line data are given, so the line's is taken equal to , and is the generator neutral impedance.
Healthy-phase voltage for an SLG fault on phase through :
Data: /km, mH/km, nF/km, length 400 km, fault at km, , .
Step 1: line constants
Step 2: prefault voltage at the midpoint (Ferranti)
Step 3: sequence impedances
Step 4: healthy-phase voltages
Step 5: temporary overvoltage
| Quantity | Value |
|---|---|
| Ferranti factor at mid-line | 1.0707 |
| Earth-fault factor $ | a^2 - m |
| TOV (phase ) | 1.290 pu ≈ 297.8 kV |
Answer: TOV on the healthy phase ≈ 1.29 pu (≈ 298 kV rms to ground, peak ≈ 421 kV), with the stated assumptions. The ratio is high here because of the generator grounding impedance. A lower neutral impedance would reduce the TOV.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Temporary overvoltage for SLG fault at line end · High Voltage Engineering, chapter 3
- Healthy-phase overvoltage in SLG fault; effective grounding · High Voltage Engineering, chapter 3
- Surge impedance and travel time of 400 km line · High Voltage Engineering, chapter 3
- Temporary overvoltage at no load and its remedy · High Voltage Engineering, chapter 3
- Switching overvoltage with trapped charge and Rs · High Voltage Engineering, chapter 3 · asked 3×
- RI levels of 400 kV line at 1 MHz · High Voltage Engineering, chapter 5
- 450 km 400 kV line, 420 MW, 0.9 pf · Power System Analysis I, chapter 5
- 450 km 400 kV line, 420 MW, 0.95 pf · Power System Analysis I, chapter 5
- Voltage 150 km along a 400 km line · Power System Analysis I, chapter 5
- Nominal-T 100 km line, 50 MVA at 132 kV · Power System Analysis I, chapter 6