- Asked 4/20
- 2072 Magh · 10 marks
Economical span, double circuit, 5° deviation
Short answer
All towers designed for 5° deviation; using wind and deviation loads, bending moment, and Ryle's formula, tower weight per km is 30.09 t at 250 m, 30.30 t at 300 m, and 31.39 t at 350 m. The most economical span is 250 m.
The design data for a double circuit transmission line with a double earth wire are as follows:
| Span | Dmax (m) | h1 (m) | h2 (m) | h3 (m) | Ht (m) |
|---|---|---|---|---|---|
| 250 m | 5.27 | 12.18 | 15.00 | 17.82 | 28.44 |
| 300 m | 7.30 | 14.21 | 17.03 | 19.85 | 30.47 |
| 350 m | 9.65 | 16.56 | 19.38 | 22.20 | 32.82 |
where h1, h2 and h3 are heights of lower, middle and top power conductor from ground and Ht is the total height of tower. The power conductor has maximum working tension of 6000 kg and diameter of 4 cm. The earth wire has maximum working tension of 2000 kg and diameter of 2 cm. Assume maximum conductor deviation of 5° is permissible for all towers and the wind force is 100 kg/m². Compute the most economical span.
The most economical span is the one that gives the least total tower weight (cost) per km. Each tower's bending moment is computed from the wind load plus the 5° deviation load, and the tower weight is then found from Ryle's formula.
Tower weight is taken from Ryle's formula (as given with IOE papers):
Here is in ft, is the bending moment at the base in klb-ft, and FS = 2 (assumed). The conversions are 1 m = 3.281 ft and 1 kg·m = 0.007233 klb-ft. Tower cost is taken as proportional to tower weight, and the number of towers per km is about . So the span with the least tower weight per km is the most economical.
Loads and bending moment
For each span the loads on a tower are found as follows. The wind span is taken equal to the span.
- Each power conductor (6 of them, 2 at each height ):
- Each earth wire (2 of them, at height ):
- Bending moment at the base:
Wind on the tower body is neglected because it is about the same for all spans.
All towers are designed for the permissible deviation θ = 5°.
Sample calculation for L = 250 m, θ = 5°:
Results
| Span L (m) | (kg) | (kg) | M (kg·m) | (t) | Towers/km | Weight/km (t) |
|---|---|---|---|---|---|---|
| 250 | 1523.4 | 674.5 | 175,473 | 7.522 | 4.000 | 30.09 |
| 300 | 1723.4 | 774.5 | 223,297 | 9.091 | 3.333 | 30.30 |
| 350 | 1923.4 | 874.5 | 281,057 | 10.986 | 2.857 | 31.39 |
The tower weight per km rises steadily from 250 m to 350 m. The extra height and moment of the longer spans outweigh the saving from having fewer towers.
Answer: of the three spans given, the most economical is 250 m, with about 30.09 t of tower steel per km, against 30.30 t/km for 300 m and 31.39 t/km for 350 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Most economical span, double circuit line · Transmission and Distribution System Design, chapter 4 · asked 6×
- Economical span, double circuit, five spans · Transmission and Distribution System Design, chapter 4 · asked 6×
- Economical span, double circuit, A/B/C towers · Transmission and Distribution System Design, chapter 4 · asked 5×
- Economical span, 200 km, 10% angle towers · Transmission and Distribution System Design, chapter 4 · asked 2×
- Most economical span, 180 km single circuit · Transmission and Distribution System Design, chapter 4
- Economical span, 200 km, A/B/C tower types · Transmission and Distribution System Design, chapter 4 · asked 6×
- T/F: double earth wire for 400 kV single circuit · Transmission and Distribution System Design, chapter 3
- Initial line design for 200 MW over 120 km · Transmission and Distribution System Design, chapter 2
- Design: 250 m head plant, 66 kV double circuit · Power Plant Design, chapter 4 · asked 13×
- Block diagram reduction: G1–G4 with H1, H2, H3 · Control Systems, chapter 3 · asked 3×
- Block diagram reduction: G1–G4 with H1, H2, H3 loops · Control Systems, chapter 3 · asked 2×
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
All Transmission and Distribution System Design chapter 4 questions →