Skip to main content

Economical span, double circuit, five spans

Short answer

The most economical span is 275 m, yielding the minimum tower weight per km of 30.06 t/km. It is determined by computing base bending moment and tower weight via Ryle's formula for each span and selecting the least weight per km.

To transmit a given amount of power to a given distance a double circuit line with a double earth wire is chosen for which the following design steps are completed, compute the most economical span.

SpanDmax (m)h1 (m)h2 (m)h3 (m)Ht (m)
250 m5.2712.17814.99817.81828.444
275 m6.2413.14815.96818.78829.414
300 m7.3014.20817.02819.84830.474
325 m8.4315.33818.15820.97831.604
350 m9.6516.55819.37822.19832.824

Where h1: height of lower conductor from ground, h2: height of middle conductor from ground, h3: height of top conductor from ground, Ht: total height of tower. The power conductor has maximum working tension of 6000 kg and diameter of 4 cm. The earth wire has maximum working tension of 2000 kg and diameter of 2 cm. Assume maximum conductor deviation of 5° is permissible for all towers and the wind force is 100 kg/m².

The most economical span gives the minimum tower weight (cost) per km of line. For each span, compute the base bending moment of a 5° deviation tower, then the tower weight from Ryle's formula, then the weight per km.

Tower weight is taken from Ryle's formula (as given with IOE papers):

Wt=0.0016 HtM×FS  tonneW_t = 0.0016\,H_t\sqrt{M\times FS}\ \ \text{tonne}

Here HtH_t is in ft, MM is the bending moment at the base in klb-ft, and FS = 2 (assumed). The conversions are 1 m = 3.281 ft and 1 kg·m = 0.007233 klb-ft. Tower cost is taken as proportional to tower weight, and the number of towers per km is about 1000/L1000/L. So the span with the least tower weight per km is the most economical.

Loads and bending moment

For each span LL the loads on a tower are found as follows. The wind span is taken equal to the span.

  • Each power conductor (6 of them, 2 at each height h1,h2,h3h_1, h_2, h_3):
Fc=p dc L+2Tcsin⁡θ2=100×0.04 L+2×6000sin⁡θ2 kgF_c = p\,d_c\,L + 2T_c\sin\frac{\theta}{2} = 100\times0.04\,L + 2\times6000\sin\frac{\theta}{2}\ \text{kg}
  • Each earth wire (2 of them, at height HtH_t):
Fe=p de L+2Tesin⁡θ2=100×0.02 L+2×2000sin⁡θ2 kgF_e = p\,d_e\,L + 2T_e\sin\frac{\theta}{2} = 100\times0.02\,L + 2\times2000\sin\frac{\theta}{2}\ \text{kg}
  • Bending moment at the base:
M=2Fc(h1+h2+h3)+2FeHtM = 2F_c(h_1+h_2+h_3) + 2F_e H_t

Wind on the tower body is neglected because it is about the same for all spans.

All towers are designed for the maximum permissible deviation θ = 5°, so 2sin⁡2.5∘=0.087242\sin2.5^\circ = 0.08724.

Sample calculation for L = 250 m, θ = 5°:

Fc=100×0.04×250+12000sin⁡2.5∘=1000+523.4=1523.4 kgFe=100×0.02×250+4000sin⁡2.5∘=500+174.5=674.5 kgM=2(1523.4)(12.178+14.998+17.818)+2(674.5)(28.444)=175,460 kg⋅m=1269.1 klb-ftWt=0.0016×(28.444×3.281)1269.1×2=7.522 tWeight/km=7.522×1000250=30.090 t/km\begin{aligned} F_c &= 100\times0.04\times250 + 12000\sin2.5^\circ = 1000+523.4 = 1523.4\ \text{kg}\\ F_e &= 100\times0.02\times250 + 4000\sin2.5^\circ = 500+174.5 = 674.5\ \text{kg}\\ M &= 2(1523.4)(12.178+14.998+17.818) + 2(674.5)(28.444) = 175{,}460\ \text{kg·m}\\ &= 1269.1\ \text{klb-ft}\\ W_t &= 0.0016\times(28.444\times3.281)\sqrt{1269.1\times2} = 7.522\ \text{t}\\ \text{Weight/km} &= 7.522\times\frac{1000}{250} = 30.090\ \text{t/km} \end{aligned}

Results for all spans

Span L (m)FcF_c (kg)FeF_e (kg)M (kg·m)WtW_t (t)Towers/kmWeight/km (t)
2501523.4674.5175,4607.5224.00030.090
2751623.4724.5198,1578.2673.63630.061
3001723.4774.5223,2839.0923.33330.305
3251823.4824.5250,7739.9923.07730.745
3501923.4874.5281,04110.9862.85731.390

Steps followed:

  1. FcF_c and FeF_e increase with span because the wind span increases.
  2. MM increases because both the loads and the heights (h1,h2,h3,Hth_1,h_2,h_3,H_t, which include the sag) increase.
  3. WtW_t increases, but the number of towers per km falls.
  4. The product, weight per km, is lowest at 275 m (30.061 t/km). It is only slightly higher at 250 m (30.090 t/km) and then rises clearly from 300 m onwards.
 t/km
 31.4 |                              *
 30.7 |                       *
 30.3 |                *
 30.1 |  *      *
      +--+------+------+------+------+--
        250    275    300    325    350  span (m)

Answer: the most economical span is 275 m, with a tower weight of 8.267 t per tower and 30.06 t per km.

✓ Answer checked by Claude Opus 5.5 (high effort)