- 2074 Bhadra · 1+3 marks
Ruling span and surveying requirements
Short answer
Ruling span is the equivalent span in a tension section that represents the effect of multiple unequal spans on sag-tension changes, calculated as sqrt(∑L³/∑L). Surveying involves reconnaissance, walk-over survey, detailed profile and tower spotting using sag templates, soil investigation, and right-of-way assessment.
What is ruling span? Explain the surveying requirement for transmission and distribution line design.
Ruling span
In a line section between two tension (anchor) towers, the suspension strings let the tension equalise across spans of unequal length. The ruling (equivalent) span is the single hypothetical span whose tension changes with temperature and loading in the same way as the whole section. It is used to prepare the stringing (sag–tension) charts:
A simpler approximation is .
Surveying requirements for T&D line design
- Reconnaissance survey: study topographic maps or satellite images and visit the site. Identify alternative routes, avoiding forests, settlements, protected areas, landslide zones and airports.
- Preliminary (walk-over) survey: choose the best route for length, access, crossings and right-of-way cost. Fix the angle points.
- Detailed survey:
- Traverse along the route with total station or GPS. Record angle points and deviation angles.
- Take the longitudinal profile along the centre line and cross-sections on slopes.
- Plot the profile and use a sag template to place towers.
- Tower spotting: place towers on the profile using the hot-curve (maximum sag) and cold-curve (uplift) templates. Ground clearance must be kept everywhere. This also gives the ruling span of each section.
- Check survey: stake out the tower locations and confirm the clearances to roads, power and telecom lines, rivers and buildings.
- Soil investigation: test the soil at the tower locations to classify it for foundation design.
- Right-of-way and land records: identify land owners and the trees to cut, for compensation and permits.
- Distribution lines: survey the road-side routes, the load locations for transformer siting, and the pole spans (about 50–80 m).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Most economical span, double circuit line · Transmission and Distribution System Design, chapter 4 · asked 6×
- T/F: X/R ratio, transmission vs distribution · Transmission and Distribution System Design, chapter 1
- Criteria for distribution line route selection · Transmission and Distribution System Design, chapter 7 · asked 3×
- Initial line design for 200 MW over 120 km · Transmission and Distribution System Design, chapter 2
- Economical span, double circuit, five spans · Transmission and Distribution System Design, chapter 4 · asked 6×
- Economical span, double circuit, A/B/C towers · Transmission and Distribution System Design, chapter 4 · asked 5×
- Transmission line issues in high speed design · Instrumentation II, chapter 7
- Design main transmission pipes PQ and QR · Water Supply Engineering, chapter 7
- Transmission and distribution planning procedure · Power Plant Design, chapter 2
- Waveguide vs transmission line · Electromagnetism, chapter 6 · asked 3×
All Transmission and Distribution System Design chapter 4 questions →