- Asked 2/20
- 2078 Chaitra · 1+3 marks
- 2070 Magh · 1+3 marks
T/F: simulation method for small area forecast
Short answer
TRUE. Small-area loads do not grow smoothly and often have no load history. The simulation (land-use) method uses zoning, load densities, and development patterns to forecast spatially and when load will appear, making it more suitable than trending.
State and justify whether the following statement is TRUE or FALSE: For small area load forecasting, simulation method is more suitable.
TRUE.
Small area load forecasting predicts the location, amount and timing of load growth in small zones (a few hectares to a few km², or a feeder/distribution transformer service area). The simulation (land-use) method is better suited for this than trending.
Justification:
- In a small area the load does not grow smoothly. It stays almost zero for years, then grows very fast when the land is developed, and then saturates (S-shaped growth curve). Trending of past load data cannot predict when this sudden growth will start.
- Many small areas have little or no load history (vacant land, new housing plots), so there is nothing to extrapolate.
- The simulation method uses land-use data (residential, commercial, industrial, vacant), zoning plans, road and infrastructure development, distance to urban centres and per-hectare load densities of each land-use class. It models how and where land will be developed and converts it into load.
- It can therefore forecast load in areas where development has not yet started, and it gives the spatial (map-wise) distribution of load needed to site substations, transformers and feeders.
- It also allows "what if" studies (e.g. a new highway or industrial estate).
Trending works well for large areas where growth is smooth and history is long; for small areas the simulation method gives more accurate spatial forecasts, though it needs more data and effort.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Justify: trending method for large area forecast · Transmission and Distribution System Design, chapter 6
- Small area forecasting with load growth curve · Transmission and Distribution System Design, chapter 6
- Small area load forecasting method · Transmission and Distribution System Design, chapter 6
- T/F: radial more reliable than network · Transmission and Distribution System Design, chapter 5 · asked 2×
- T/F: grid connected system more stable · Transmission and Distribution System Design, chapter 1
- T/F: higher voltage more economical · Transmission and Distribution System Design, chapter 2
- True/false: series motor started at no load · Electrical Machine, chapter 4
- DC series motor started at no load: true/false · Electrical Machines, chapter 4
- True/false: load rejection raises terminal voltage · High Voltage Engineering, chapter 3
- True/false: derivative controllers always used with others · Control Systems, chapter 7 · asked 3×
All Transmission and Distribution System Design chapter 6 questions →