T/F: under-loaded distribution transformer losses

Short answer

FALSE. Transformers have constant core loss whenever energized. At very light loads, copper loss is small but core loss continues, causing percentage energy loss to rise. Maximum efficiency occurs where copper loss equals core loss (typically 40–60% load). Gross underloading wastes energy.

State whether the following statement is TRUE or FALSE and justify your answer with brief explanation: A distribution transformer operating at significantly under-loading conditions is always beneficial from energy loss prospective.

FALSE.

Justification:

A transformer has two kinds of loss:

  • No-load (core) loss PiP_i: constant whenever the transformer is energised, regardless of load.
  • Load (copper) loss: Pcu=x2Pcu,FLP_{cu} = x^2 P_{cu,FL}, where xx is the fraction of rated load.

Efficiency is maximum when copper loss equals core loss, i.e. at load fraction

xη,max=PiPcu,FLx_{\eta,max} = \sqrt{\frac{P_i}{P_{cu,FL}}}

which is typically 40–60% of rating for distribution transformers.

When the transformer is significantly under-loaded:

  • Copper loss becomes very small, but the core loss continues for all 8760 hours.
  • The energy delivered is small, so the percentage energy loss rises.

Example: 100 kVA unit, Pi=200P_i = 200 W, Pcu,FL=1100P_{cu,FL} = 1100 W, LLF taken as 0.3 for illustration.

Peak loadCore loss (kWh/yr)Cu loss (kWh/yr)Total
20 kVA17521100 × 0.04 × 0.3 × 8.76 = 1161868
60 kVA17521100 × 0.36 × 0.3 × 8.76 = 10412793

The 20 kVA case carries one-third of the load but has two-thirds of the losses, so loss per kWh delivered is about twice as high.

Therefore gross under-loading (oversized transformers) wastes energy through core loss, as well as capital. Moderate under-loading near the maximum-efficiency point is beneficial; very light loading is not. This is why transformers should be sized for the realistic design-year demand and why low-loss cores are used where load factor is low.