- Asked 2/31
- 2076 Asoj · 4 marks
Area by DMD, traverse ABCD (225.28)
Short answer
DMDs: 227.26, 871.78, 1092.57, 448.05 m; Σ(L×DMD) = −326035.30 m². Area = 163017.65 m² (16.3018 ha).
Calculate the area of the following traverse by using DMD method.
| Line | AB | BC | CD | DA |
|---|---|---|---|---|
| Latitude (m) | 225.28 | -139.61 | -336.90 | 251.23 |
| Departure (m) | 227.26 | 417.26 | -196.47 | -448.05 |
The traverse closes: ΣL = 0.00 and ΣD = 0.00.
DMD method
DMD rule (taking the meridian through the starting station):
-
DMD of the first line = departure of the first line.
-
DMD of any line = DMD of the previous line + departure of the previous line + departure of the line itself.
-
DMD of the last line = departure of the last line with opposite sign (a check).
-
Double area = Σ (latitude × DMD), and area = ½ |Σ L × DMD|.
-
DMD(AB) = D(AB) = 227.26
-
DMD(BC) = 227.26 + (227.26) + (417.26) = 871.78
-
DMD(CD) = 871.78 + (417.26) + (-196.47) = 1092.57
-
DMD(DA) = 1092.57 + (-196.47) + (-448.05) = 448.05
-
Check: DMD(DA) = 448.05 = −D(DA) = 448.05, so the DMDs are correct.
| Line | Latitude L (m) | Departure D (m) | DMD (m) | L × DMD (m²) |
|---|---|---|---|---|
| AB | 225.28 | 227.26 | 227.26 | 51197.13 |
| BC | -139.61 | 417.26 | 871.78 | -121709.21 |
| CD | -336.90 | -196.47 | 1092.57 | -368086.83 |
| DA | 251.23 | -448.05 | 448.05 | 112563.60 |
| Sum | 0.00 | 0.00 | -326035.30 |
Answer: Area = 163017.65 m² (16.3018 ha).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Area by DMD, departure AB 405.85 · Surveying I, chapter 9 · asked 2×
- Area by total coordinates and DMD (AB 90.29) · Surveying I, chapter 9
- Area by coordinates and DMD (AB -370) · Surveying I, chapter 9 · asked 4×
- Area by DMD, traverse ABCDEA (-5.693) · Surveying I, chapter 9 · asked 4×
- Area of traverse by DMD and coordinates (N/S/E/W) · Surveying I, chapter 9
- Area by DMD, traverse ABCDE (+218) · Surveying I, chapter 9 · asked 4×
- Area by DMD, traverse PQRS · Surveying I, chapter 9 · asked 4×
- Bearings of BC and CD in traverse ABCDE · Surveying II, chapter 1 · asked 2×
- Hardy-Cross network discharge AB, BC, AD, CD · Water Supply Engineering, chapter 7
- Head loss and velocity in loop pipes AB, BC, AC, CD · Water Supply Engineering, chapter 7
- Design pipelines AB, BC and CD, C = 120 · Water Supply Engineering, chapter 7