Abstract: A multimedia lab at Tinkune trains students in digital media with 15 workstations, recording corner, and 4-month build. Technical: 900 sq ft room, high-spec computers, cameras, editing software, gigabit LAN, UPS. Cost: Rs. 54,60,000 total.

Write a proposal on the construction of a multi media lab in your local town including technical section, cost estimate and abstract sections in it.

Abstract

This proposal describes the construction of a multimedia lab at Tinkune, Kathmandu, to train students and young people in digital video, audio, animation and graphic design. Local students and small media houses have no easy access to modern editing machines. The lab will have 15 high-performance workstations, a small recording corner, and an audio-visual hall. It will be built within four months in an existing room of the municipality's community building. The estimated cost is Rs. 54,60,000. The lab will provide training, support local content production, and earn income from service fees.

Technical section

  1. Space: a 900 sq. ft. room divided into a work area for 15 students, a recording corner with sound-proofing, and an instructor's desk.
  2. Equipment: 15 workstations (i7, 32 GB RAM, dedicated graphics, 27-inch monitors), a central storage server, a camera set with lights, microphones and headphones, a projector and a sound system.
  3. Software: video and audio editing, animation, graphic design and 3D tools, using licensed or open source software.
  4. Network and power: gigabit LAN, 100 Mbps internet and a 5 kVA UPS.
  5. Work plan: design and approval - 2 weeks; renovation - 4 weeks; purchase and delivery - 6 weeks; installation and testing - 2 weeks; first training - month 5.
  6. Operation: two trainers and one technician; three-month courses in batches of 15.

Cost estimate

S.N.ItemAmount (Rs.)
1Room renovation, flooring and acoustic treatment4,50,000
2Workstations for multimedia editing (15 units)22,50,000
3Server and storage6,00,000
4Cameras, lights and microphone set5,50,000
5Software (video, audio and graphics editing)3,00,000
6Projector, screen and sound system4,00,000
7Networking and electrical work2,50,000
8Furniture, air-conditioning and installation4,00,000
Sub-total52,00,000
Contingency (5%)2,60,000
Grand total54,60,000