- 2075 Baisakh · 6 marks
Relay 1 time and relay 2 TMS (3000 A)
Short answer
For relay 1: pickup 1.25×300=375 A, PSM=3000/375=8, t at TMS=1=3.15 s, operating time=0.4×3.15=1.26 s. For relay 2: pickup 1.5×300=450 A, PSM=6.67, t at TMS=1=3.5 s, required time=1.26+0.5=1.76 s, TMS=1.76/3.5=0.503.
Calculate the time of operation of relay 1 and time setting multiplier for relay 2 for the conditions given below: (i) Time grading margin between the relays is 0.5 sec (ii) The time setting multiplier of relay 1 is 0.4 (iii) CT ratio of both CTs is 300/1 (iv) The fault occurs at point F and fault current is 3000 A (v) Time current characteristic of both relays is given in table. [Figure: CB – CT with Relay 2 (plug setting = 150%) – CB – CT with Relay 1 (plug setting = 125%) – fault point F.]
| PSM | 2 | 3.6 | 5 | 6.67 | 8 | 10 | 15 | 20 |
|---|---|---|---|---|---|---|---|---|
| Time in sec | 10 | 6 | 3.9 | 3.5 | 3.15 | 2.8 | 2.2 | 2.1 |
Relay 1 (near fault F) is the primary relay; relay 2 backs it up with a 0.5 s margin.
Data: CT 300/1 for both, plug setting R1 = 125%, R2 = 150%, TMS of R1 = 0.4, If = 3000 A.
Relay 1
Pick-up = 1.25 × 300 = 375 A
PSM = 3000/375 = 8 → t(TMS=1) = 3.15 s
t1 = 0.4 × 3.15 = 1.26 s
Relay 2
Pick-up = 1.5 × 300 = 450 A
PSM = 3000/450 = 6.67 → t(TMS=1) = 3.5 s
Required t2 = 1.26 + 0.5 = 1.76 s
TMS2 = 1.76 / 3.5 = 0.503
| Relay | Pick-up | PSM | t at TMS=1 | TMS | Time |
|---|---|---|---|---|---|
| 1 | 375 A | 8 | 3.15 s | 0.4 | 1.26 s |
| 2 | 450 A | 6.67 | 3.5 s | 0.503 | 1.76 s |
Answer: operating time of relay 1 = 1.26 s; TMS of relay 2 ≈ 0.503 (≈ 0.5), giving t2 = 1.76 s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Operating time of two relays (250/1, 3000 A) · Switchgear and Protection, chapter 7
- IDMT grading: R1, R2 with 1000/5 CTs · Switchgear and Protection, chapter 7 · asked 2×
- Operating time of two relays (300/1, 6000 A) · Switchgear and Protection, chapter 7
- Time-current grading for relays X, Y, Z · Switchgear and Protection, chapter 7
- Design IDMT grading for relays A and B · Switchgear and Protection, chapter 7
- Minimum TMS of relay A (16000 A fault) · Switchgear and Protection, chapter 7
- Both types of payback period, 3000 investment · Engineering Economics, chapter 3
- Critical clearing time and angle, fault at P · Power System Analysis II, chapter 6