Droop calculation: 800 MW and 300 MW units

Short answer

From no-load 51 Hz to full-load lines: stiffness from operating points gives droops. On own ratings, R1 = 2.67%, R2 = 3%. At 50.2 Hz (drop 0.8 Hz from no-load), G1 supplies 480 MW, G2 supplies 160 MW, total 640 MW.

Shows figure below two generators operating in parallel and supplying a load of 800 MW. G1 is rated as 800 MW and G2 is rated as 300 MW. G1 supplies 600 MW and G2 supplies 200 MW and system frequency is 50 Hz. At no-load, they operate at a common frequency of 51 Hz. Calculate droop regulations R1 and R2 of G1 and G2 with respect their ratings. Assume base power = 1000 MW. When the load is decreased below 800 MW, the frequency increases to 50.2 Hz. Calculate the power supplied by each generator at reduced load. [Figure: G1 (800 MW, R1 = ?) supplying P1 = 600 MW and G2 (300 MW, R2 = ?) supplying P2 = 200 MW to a common bus feeding load PL = 800 MW]

The droop line of each unit passes through its no-load point (51 Hz, 0 MW) and its present operating point (50 Hz, given MW). Extending the line to rated output gives the droop.

Frequency drop from no load to present load: Δf=51−50=1\Delta f = 51 - 50 = 1 Hz.

Stiffness of each unit:

K1=6001=600 MW/Hz,K2=2001=200 MW/HzK_1 = \frac{600}{1} = 600\ \text{MW/Hz}, \qquad K_2 = \frac{200}{1} = 200\ \text{MW/Hz}

Droop on own ratings

Frequency drop at rated output: G1: 800/600=1.333800/600 = 1.333 Hz; G2: 300/200=1.5300/200 = 1.5 Hz.

R1=1.333/501=0.02667=2.67 %R2=1.5/501=0.03=3 %\begin{aligned} R_1 &= \frac{1.333/50}{1} = 0.02667 = 2.67\ \% \\ R_2 &= \frac{1.5/50}{1} = 0.03 = 3\ \% \end{aligned}

Droop on the common base of 1000 MW

Rnew=Rown×SbaseSratedR_{new} = R_{own} \times \frac{S_{base}}{S_{rated}} R1=0.02667×1000800=0.0333=3.33 %R2=0.03×1000300=0.10=10 %\begin{aligned} R_1 &= 0.02667 \times \frac{1000}{800} = 0.0333 = 3.33\ \% \\ R_2 &= 0.03 \times \frac{1000}{300} = 0.10 = 10\ \% \end{aligned}

Check: ΔPi=(Δf/f0) Sbase/Ri\Delta P_i = (\Delta f/f_0)\,S_{base}/R_i: G1 =0.02×1000/0.0333=600= 0.02 \times 1000/0.0333 = 600 MW ✓, G2 =0.02×1000/0.1=200= 0.02 \times 1000/0.1 = 200 MW ✓.

Load sharing at 50.2 Hz

Frequency drop from no load =51−50.2=0.8= 51 - 50.2 = 0.8 Hz.

P1=600×0.8=480 MWP2=200×0.8=160 MW\begin{aligned} P_1 &= 600 \times 0.8 = 480\ \text{MW} \\ P_2 &= 200 \times 0.8 = 160\ \text{MW} \end{aligned}

Total load =640= 640 MW, i.e. the load has decreased by 160 MW (G1 sheds 120 MW, G2 sheds 40 MW).

Answer: R1=2.67 %R_1 = 2.67\ \% and R2=3 %R_2 = 3\ \% on own ratings (3.33 % and 10 % on 1000 MW base). At 50.2 Hz, G1 = 480 MW, G2 = 160 MW (total 640 MW).