Load sharing: 250/500 MW, frequency falls to 49.5 Hz
Short answer
Stiffness: K1=125 MW/Hz, K2=500 MW/Hz. With 0.5 Hz drop, system load increases by 312.5 MW. G1 takes 62.5 MW (now 187.5 MW), G2 takes 250 MW (now 500 MW, fully loaded).
Two generators of 250 MW and 500 MW capacities respectively are operating in parallel and connected to a common bus. When Each generator is half loaded, they operates at a common frequency of 50 Hz. Their droops characteristics are 4% and 2% respectively based on their respective capacities. When the system load is increased, the frequency decreases to 49.5 Hz. Calculate the increase in system load and load shared by each generator.
Both generators move down their droop lines to the common frequency of 49.5 Hz; the load increase is the sum of what each picks up.
Method: with droop (pu, on its own rating ) and rated frequency , the droop line of each unit gives
where is the stiffness of the unit in MW/Hz. For the units together, .
Data: MW, ; MW, ; Hz. Initial loads: 125 MW and 250 MW (half load). Hz.
Stiffness:
Increase in load on each generator:
Increase in system load:
| Generator | Rating (MW) | Droop | Initial (MW) | Increase (MW) | New (MW) |
|---|---|---|---|---|---|
| G1 | 250 | 4 % | 125 | 62.5 | 187.5 |
| G2 | 500 | 2 % | 250 | 250 | 500 |
| Total | 750 | – | 375 | 312.5 | 687.5 |
Answer: The system load increased by 312.5 MW. G1 shares 62.5 MW (now 187.5 MW) and G2 shares 250 MW (now 500 MW, i.e. fully loaded). Any further load increase would overload G2.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Load decrease: 250 and 500 MW at 49 Hz · Power Plant Equipment, chapter 2
- Load sharing: 250 MW and 500 MW, 4%/3% droop · Power Plant Equipment, chapter 2
- Load sharing: 500 MW and 250 MW, 5%/6% droop · Power Plant Equipment, chapter 2 · asked 2×
- Load sharing: 250 MW and 500 MW, 20%/10% droop · Power Plant Equipment, chapter 2 · asked 2×
- Load sharing: 600 and 300 MW at 49 Hz · Power Plant Equipment, chapter 2 · asked 4×
- Droop for capacity sharing: 500 and 250 MW · Power Plant Equipment, chapter 2
- Load sharing between two stations in parallel · Electric Machines II, chapter 1
- Load sharing of 50 kVA and 25 kVA transformers in parallel · Electrical Machines I, chapter 2
- Load sharing of two transformers in parallel · Electrical Machines, chapter 2