- 2082 Bhadra (new course) · 3 marks
Load sharing between two stations in parallel
Short answer
Droop: A: 0.03 Hz/MW, B: 0.07 Hz/MW. Solving f=50-0.03PA=50-0.07PB and PA+PB=50 gives PA=35 MW, PB=15 MW, f=48.95 Hz. Load not proportional to ratings; A with smaller regulation takes larger share. Frequency drops; secondary control needed to restore 50 Hz.
Two station generators A and B operate in parallel. Station capacity of A is 50 MW and that of B is 25 MW. Full load speed regulation of station A is 3% and B is 3.5%. Calculate the load sharing if the connected load is 50 MW, no load frequency is 50 Hz. Comment on the answer.
Each station follows a linear speed (frequency) droop: frequency falls from the no-load value (50 Hz) by its regulation percentage at its full load.
Droop of each station
Load sharing
Both run at the same frequency :
Comment
- A supplies 35 MW (70% of its capacity) and B supplies 15 MW (60% of its capacity).
- The load is not shared in proportion to the ratings (which would be 33.3 : 16.7 MW). B has the steeper droop (larger Hz/MW), and A, with the smaller speed regulation, takes a larger share relative to its rating.
- For load sharing in proportion to ratings, the per-unit droops must be equal.
- The frequency falls to 48.95 Hz; the governor speed settings must be raised (secondary control) to restore 50 Hz.
Answer: P_A = 35 MW, P_B = 15 MW, common frequency = 48.95 Hz.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Internal emf, no-load emf and regulation · Electric Machines II, chapter 1
- Regulation of delta connected 1600 kVA alternator · Electric Machines II, chapter 1
- Emf, regulation and loading with given load impedance · Electric Machines II, chapter 1
- Synchronous reactance and regulation from test data · Electric Machines II, chapter 1
- Power angle and regulation of 10 kVA alternator · Electric Machines II, chapter 1
- Regulation of 10 kVA round-rotor generator · Electric Machines II, chapter 1
- Load sharing: 600 and 300 MW, 51 Hz no-load · Power Plant Equipment, chapter 2
- Load sharing: 250/500 MW, frequency falls to 49.5 Hz · Power Plant Equipment, chapter 2 · asked 2×
- Load sharing of 50 kVA and 25 kVA transformers in parallel · Electrical Machines I, chapter 2
- Load sharing: 900 MW and 450 MW generators · Power Plant Equipment, chapter 2