- 2072 Magh · 8 marks
Discharge exceedance and turbine criterion
Short answer
Discharge exceedance is percentage of time a flow is equalled or exceeded, read from flow duration curve; ROR plants often designed at Q40-Q45. Turbine selection criteria: net head, specific speed, discharge variation, part-load efficiency, cavitation, sediment, cost.
What do you mean by discharge exceedance? Describe the criterion for selecting turbine in hydro-electric power plant.
Discharge exceedance
Discharge exceedance is the percentage of time a given river discharge is equalled or exceeded. It is read from the flow duration curve (FDC). For example, m³/s means the river flow is 10 m³/s or more for 45% of the time (about 164 days a year).
- Low exceedance (e.g. ) → large flow, available for a short time.
- High exceedance (e.g. ) → small but dependable (firm) flow.
- In Nepal, ROR projects are usually designed at about –; firm power is judged from –.
- Exceedance is found by ranking the recorded flows in descending order and computing for rank out of values.
- The choice of design exceedance is a trade-off: a lower exceedance gives more installed capacity and energy but a lower plant factor and higher cost per kW.
Q
|\
| \
| \___ Q45
| \_____ Q65
| \______ Q95
+---------------------> % exceedance
Criteria for selecting turbine
- Net head: Pelton for high head (50–1300 m), Francis for medium head (10–350 m), Kaplan/propeller for low head (2–40 m). Crossflow (Michell–Banki) and Turgo are used in small plants.
- Specific speed: ; Pelton 10–35, Francis 60–300, Kaplan 300–1000 (metric, kW).
- Discharge and its variation: if flow varies greatly, choose a turbine with good part-load efficiency (Pelton, Kaplan) or use several units.
- Part-load operation: Francis efficiency falls below about 40–50% load; Pelton remains efficient down to 20%.
- Rotational speed: higher speed gives smaller generator; limited by cavitation and runaway speed.
- Cavitation: Thoma's coefficient fixes the setting below tailwater for reaction turbines.
- Sediment and abrasion: important for Himalayan rivers.
- Cost, efficiency, maintenance and local experience.
Example
For a site with m and m³/s split into two units of 3 m³/s, unit power MW. At 750 rpm, , at the boundary of multi-jet Pelton and slow Francis; the Pelton is preferred if the river is silty or long part-load running is expected.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Combined cycle gas turbine versus hydro · Power Plant Design, chapter 1
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×
- Design exceedance Q45% versus Q65% · Power Plant Design, chapter 3
- Design: 550 m head plant, transformer quotation · Power Plant Design, chapter 4 · asked 3×
- Design: 245 m head plant, standby generator · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant at Q25% · Power Plant Design, chapter 4 · asked 14×
- Reheat gas turbine power plant · Power Plant Equipment, chapter 6
- Pumped storage plant: power, turbine, setting, surge · Hydropower Engineering, chapter 7
- Operation of pumped storage hydro plant · Power Plant Equipment, chapter 1 · asked 2×
- Micro hydro net head, power and energy · Energy Resources, chapter 5