- 2079 Shrawan · 8 marks
PROR environmental impact and schematic
Short answer
A peaking run-of-river plant causes daily flow fluctuations harming aquatic life, dewatered stretches, pond submergence, and sediment flush releases. The plant includes a diversion dam, intake, gravel trap, desander, daily pondage, headrace tunnel, surge tank, penstock, Francis turbine powerhouse, tailrace, and switchyard.
Stating environmental impact of P-ROR type hydro-power plant, draw a schematic diagram showing all the necessary components and describe each of them.
A peaking run-of-river (P-ROR) plant is an ROR plant with a small daily pondage, so that water collected during off-peak hours is used to run the plant at full capacity during the evening peak (typically 4–6 hours).
Environmental impacts of P-ROR
- Hydro-peaking downstream: flow below the tailrace rises and falls sharply every day; this disturbs fish, aquatic insects and people using the riverbank.
- Dewatered stretch: between the dam and tailrace only the riparian release flows, reducing habitat, fish migration and water for irrigation/water mills.
- Pondage submergence: a small area of land and forest is flooded; some houses or farmland may be affected.
- Sediment trapping and flushing: the pond traps sediment; periodic flushing releases very turbid water downstream.
- Construction impacts: spoil from tunnels, access roads, landslides, dust, noise and inflow of workers.
- Positive impacts: clean peaking energy that replaces diesel/thermal imports, local roads, jobs and electrification.
Mitigation: adequate riparian release (at least 10% of minimum monthly flow in Nepal), fish ladders, controlled flushing, re-afforestation and spoil management.
Schematic of a P-ROR plant
River
==|== Dam/weir with spillway + undersluice
|
Intake (trash rack, gate)
|
Gravel trap -> Desander
|
[ DAILY PONDAGE ] (stores off-peak flow)
|
Headrace tunnel
|
Surge tank
|
Penstock (+ valve house)
|
Powerhouse: Turbine-Generator-Transformer
| |
Tailrace -> River Switchyard -> Grid
Components
- Diversion dam/weir: raises water level; gated spillway passes floods; undersluice flushes sediment at the intake.
- Intake: trash rack and gates admit the design discharge.
- Gravel trap and desander: remove sediment (usually >0.2 mm) before water enters the pondage and tunnel.
- Daily pondage: a reservoir sized to store the inflow of off-peak hours so the plant can run at full output during peak hours. Its volume is about .
- Headrace tunnel: pressure tunnel carrying water to the surge tank.
- Surge tank: absorbs water hammer and meets sudden load rise.
- Penstock and valve house: steel pipe to the powerhouse with an emergency butterfly valve at the top.
- Powerhouse: turbines (Francis or Pelton depending on head), generators, governors, excitation, control and auxiliaries.
- Tailrace: returns water to the river; may include a re-regulating pond to reduce hydro-peaking.
- Switchyard and transmission line: step up and evacuate power to the grid.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Schematic of a PROR hydropower plant · Power Plant Design, chapter 3 · asked 2×
- ROR versus PROR hydropower plants · Power Plant Design, chapter 3
- Reservoir type hydropower plant schematic · Power Plant Design, chapter 3
- Sketch of a medium head PROR plant · Power Plant Design, chapter 3 · asked 2×
- Components of a run-of-river plant · Power Plant Design, chapter 3 · asked 2×
- Hydro versus thermal: techno-economic and environmental · Power Plant Design, chapter 1
- RoR and PRoR from hydrograph equation (Q40) · Hydropower Engineering, chapter 3
- Working principle of RoR, PRoR and ST plants · Hydropower Engineering, chapter 2