Sketch of a medium head PROR plant
Short answer
A PRoR plant has a weir forming pondage, intake, desander, headrace, surge tank, penstock, powerhouse with Francis turbines, tailrace, and switchyard. Pondage stores off-peak inflow for daily peaking; surge tank controls water hammer; Francis turbines suit medium head and large discharge.
Make a sketch to show various components of medium head and relatively large discharge, medium size Pondage Run of River (PRoR) hydropower plant. Also, mention the functions of each component.
A Pondage Run-of-River (PRoR) plant diverts river water through a water conductor like an ROR plant, but stores water in a pondage (daily storage) during off-peak hours so that the plant can run at full output during the peak hours (typically 4–6 hours in the evening). For medium head (about 50–300 m) and relatively large discharge, Francis turbines are used.
Sketch
River
|
======[Dam/Weir + Gates]======
| Pondage (daily storage) |---> Spillway
|_____________________________|
| |
| +--> Riparian release
[Intake + trash rack]
|
[Desander / settling basin]
|
Headrace tunnel ==============\
[Surge tank]
|
Penstock |
\|
[Powerhouse: MIV, Francis,
Generator, Governor, AVR]
| |
Tailrace GSU transformer
| |
River Switchyard -> Grid
Components and functions
| Component | Function |
|---|---|
| Diversion dam / weir with gates | Raises water level, diverts water, forms pondage |
| Pondage | Stores off-peak inflow for daily peaking operation |
| Spillway, undersluice | Passes floods, flushes sediment |
| Intake with trash rack | Admits design flow; stops debris |
| Desander (settling basin) | Removes fine sediment to protect turbines |
| Headrace tunnel | Conveys large discharge to the surge tank with low loss |
| Surge tank | Controls water hammer; supplies flow during load change |
| Penstock / pressure shaft | Carries water under pressure to turbines |
| Main inlet valve | Isolates each unit |
| Francis turbine + draft tube | Converts hydraulic energy to mechanical; draft tube recovers energy |
| Governor | Controls speed/frequency and load |
| Synchronous generator + excitation/AVR | Generates power; controls voltage and reactive power |
| Generator CB, GSU transformer | Switching and step-up to transmission voltage |
| Switchyard | Connects plant to grid; isolation and protection |
| Tailrace | Returns water to the river |
| Auxiliaries | Station transformer, DC system, diesel generator (black start), cooling, crane, SCADA |
Why PRoR
It supplies the evening peak, which is valuable in Nepal, especially in the dry season (e.g. Kaligandaki A, Middle Marsyangdi are peaking ROR plants).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×
- Daily pondage run-of-river components · Power Plant Design, chapter 3
- Components of a run-of-river plant · Power Plant Design, chapter 3 · asked 2×
- Hydropower plant components and functions · Power Plant Design, chapter 3 · asked 2×
- ROR versus PROR hydropower plants · Power Plant Design, chapter 3
- Daily pondage ROR with 150 m head · Power Plant Design, chapter 3
- RoR and PRoR from hydrograph equation (Q40) · Hydropower Engineering, chapter 3
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- Pondage surface area and weekly output · Hydropower Engineering, chapter 3
- Components that make up the Web · Web Technology, chapter 2