- 2071 Chaitra · 10 marks
Telephone office structure and distribution plant
Short answer
A telephone office contains MDF, line equipment, switching network, control, trunk equipment, and power plant; outside plant starts at MDF. Distribution plant uses feeder cables to cabinets, distribution cables to DPs, and drop wires to subscribers, with flexibility at cross-connect points.
With a neat sketch of technical structure of a telephone office, explain the distribution plant.
Technical structure of a telephone office
A telephone office (local exchange) has the switching and control equipment inside the building and the line (outside) plant outside it. Inside, all lines pass through the MDF.
TELEPHONE OFFICE (EXCHANGE)
┌──────────────────────────────────────────┐
│ Power Control Switching Trunk │─ trunks to
│ plant (SPC) ─ network ─ equipment │ other offices
│ -48 V │ │ │
│ Line equipment (BORSCHT) │
│ │ │
│ Main Distribution Frame (MDF) │
└────────────────┬─────────────────────────┘
Feeder (main) cables in ducts
│
┌────────┴────────┐
[Cabinet/PCP] [Cabinet/PCP]
│ │ │
Distribution cables (aerial/underground)
[DP] [DP] [DP]
│ │ │ │
Drop wires to subscribers' telephones
Inside equipment: MDF (termination, protection, cross-connection), subscriber line units, switching network, control processors, signalling units, trunk equipment, charging/billing, O&M terminals and the −48 V power plant with batteries.
Distribution plant
The distribution plant is the part of the outside plant that carries subscriber pairs from the exchange to individual premises. It is designed in a hierarchy so that cable sizes reduce as they approach subscribers:
- Main/feeder cable: large cables (600–2400 pairs) leave the MDF through cable vaults and underground ducts to the serving areas.
- Primary cross-connection point (PCP) or cabinet/pillar: a street cabinet where feeder pairs are jumpered to distribution pairs. It gives flexibility: spare feeder pairs can be used wherever demand grows, so fewer total pairs are needed.
- Distribution cables: smaller cables (25–200 pairs), underground or aerial on poles, run along streets.
- Distribution point (DP): a terminal box on a pole, building wall or inside a building, serving 10–20 subscribers.
- Drop (service) wire: a one- or two-pair wire from the DP to the subscriber's premises, ending in a protector and socket.
Design considerations:
- Forecast demand (5–20 years) to size cables and leave spare pairs.
- Limit loop resistance and attenuation (gauge selection, loading coils on long loops) for good transmission and signalling.
- Use ducts and manholes for easy expansion and repair; aerial cables in rural areas for low cost.
- Protect against lightning, moisture (pressurised or jelly-filled cables) and physical damage.
- Today the same structure is used for fibre access (FTTC/FTTH) with splitters at cabinets and DPs.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Telephone exchange structure; TST vs STS · Telecommunications, chapter 4
- Subscriber loop or line plant · Telecommunications, chapter 1
- Number of lifts for office building · Industrial Power Distribution and Illumination, chapter 5
- Office lighting design with CFL luminaires · Industrial Power Distribution and Illumination, chapter 7
- Intermediate beam for office hall 16 m x 6 m · Design of Steel and Timber Structure, chapter 7 · asked 2×
- Preliminary estimate: six-storey office, 3000 m² · Estimating and Costing, chapter 3