After first Gauss-Seidel iteration: Q2 = 0 pu, V2 = 1.0100∠1.1232° pu, V3 = 1.0100∠−0.5730° pu. Slack power injection: P1 = 0.0021 pu, Q1 = 0.3110 pu.
For the system in figure below, perform the load flow analysis for the first iteration by G-S method. [Figure: line 1-2 X = j0.2, line 1-3 X = j0.1, line 2-3 X = j0.1; generators at buses 1 and 2, load at bus 3]
Bus No.
Voltage
Generator P
Generator Q
Load P
Load Q
1
1.03∠0° pu
-
-
-
-
2
1.01 pu
0.3 pu
-
-
-
3
-
-
-
0.4 pu
0.2 pu
Bus 1 is the slack bus (1.03∠0∘), bus 2 a PV bus (P2=0.3 pu, ∣V2∣=1.01 pu) and bus 3 a PQ bus (P3=−0.4, Q3=−0.2 pu). Initial values: V2(0)=1.01∠0∘, V3(0)=1∠0∘. No Q-limits are given.
k=1∑3Y2kVkQ2(1)=0.0000=−Im{V2∗∑kY2kVk}=0.0000puV2(1)V2∗P2−jQ2∑k=2Y2kVkV2(1)δ2=Y221[V2∗P2−jQ2−Y21V1−Y23V3]=1.01000.3000=0.2970=j15.1500=−j15.0000(0.2970)−(j15.1500)=1.0100+j0.0198=1.1232∘⇒V2(1)=1.0100∠1.1232∘=1.0098+j0.0198(magnitude reset to 1.01)V3(1)V3∗P3−jQ3∑k=3Y3kVkV3(1)=Y331[V3∗P3−jQ3−Y31V1−Y32V2]=1.0000−0.4000+j0.2000=−0.4000+j0.2000=−0.1980+j20.3981=−j20.0000(−0.4000+j0.2000)−(−0.1980+j20.3981)=1.0099−j0.0101=1.0100∠−0.5730∘pu
At the start the voltages are such that ∑kY2kVk=0, so Q2(1)=0.