- 2073 Shrawan · 8 marks
L-G fault in phase B
Short answer
For an L-G fault on phase B, the phase-B sequence currents are equal: I_b0=I_b1=I_b2=I_b/3. The three sequence networks connect in series, with the positive network containing E_b. In phase-a reference, this requires I_a1 = aI_a0, I_a2 = a^2I_a0. The fault current is I_f = 3E_b/(Z1+Z2+Z0).
For an unloaded 3-phase, ABC phase sequence, synchronous generator, starting from the boundary condition draw and justify the interconnection of sequence networks if a L-G fault occurs in phase B.
For an L-G fault on phase B, the sequence currents of phase B are equal, , so the three sequence networks are connected in series. In terms of phase-a reference components they are joined through phase shifts: , .
Generator sequence equations (phase a reference)
Boundary conditions (bolted fault on B)
Sequence currents
Phase-b components are , , . So
The same current flows in all three networks when they are written for phase b, which means a series connection.
Voltage condition
Substituting:
since . Hence
Interconnection of sequence networks
Drawn with phase b as reference (EMF in the positive network):
Ib1 -->
+--(Eb)--Z1--F1 N2--Z2--F2 N0--Z0--F0--+
| |__| |__| |
N1 ---------------------------------------+
Ib0 = Ib1 = Ib2 = Ib/3
With phase a as reference the same series loop is used, but the currents entering the networks are linked by phase shifts: and (ideal phase-shifting transformers of and in the positive and negative networks).
Justification: the series connection satisfies both conditions: equal phase-b sequence currents and zero total phase-b voltage. The result is the same as an L-G fault on phase a, only shifted by , as expected for a symmetrical machine.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- SLG fault: sequence networks in series · Power System Analysis II, chapter 5 · asked 5×
- L-G fault of unloaded generator: equal currents · Power System Analysis II, chapter 5
- L-G fault and 3-phase fault, 30 MVA generator · Power System Analysis II, chapter 5
- Sequence networks with parallel transformer banks · Power System Analysis II, chapter 4
- DLG fault sequence network connection · Power System Analysis II, chapter 5 · asked 3×
- Sequence networks decoupled for static circuit · Power System Analysis II, chapter 4
- Justify synchronous motor is not self starting · Electric Machines II, chapter 2
- 3-phase synchronous generator construction · Electrical Machine, chapter 6
- Combined phase and earth fault protection of generator · Switchgear and Protection, chapter 7
- Justify not self starting; two starting methods · Electric Machines II, chapter 2