- 2076 Bhadra · 6 marks
Select type of CD structure: Q 32, HFD 303
Short answer
Aqueduct selected as canal bed (212 m) is 2 m above drainage HFL (210 m). Drainage waterway: 11 spans of 8 m (clear 88 m). Canal flumed to 12 m wide trough, depth 1.5 m. Inlet transition 12.5 m (2:1), outlet 18.8 m (3:1). Trough bed levels: start 211.852 m, end 211.796 m. Total head loss 0.147 m.
From the following data, select and sketch the suitable type of cross drainage structure and determine the drainage water way and canal water way. Canal data: Full supply discharge = 32 cumecs; Full supply level = 213.5 m; Canal bed level = 212.0 m; Canal bed width = 20 m. Drainage data: High flood discharge = 303 cumecs; High flood level = 210.0 m; High flood depth = 2.5 m; General ground level = 212.5 m.
The canal ( = 32 m³/s) crosses a drainage of = 303 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Canal side slope 1.5:1 (not given); drainage bed = HFL − 2.5 m = 207.5 m; Lacey's = 1; trough = 0.015. Depth of canal = FSL − bed = 1.5 m.
1. Type of structure
Canal bed level (212.00 m) is higher than HFL of the drainage (210.00 m) by 2.00 m, enough for free board and slab depth. The canal can be carried in a trough over the drain with free flow beneath, so an aqueduct is suitable.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 11 spans of 8 m with piers 1.2 m thick: clear waterway = 11 × 8 = 88 m (> 82.7 m). Overall length = 88 + 10 × 1.2 = 100.0 m.
Check: mean velocity = Q/(L·d) = 303/(88 × 2.50) = 1.38 m/s. Lacey's regime depth = 3.16 m (with = 1); foundations of piers and abutments are taken about 1.5R = 4.7 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (20 + 1.5 × 1.5) × 1.5 = 33.38 m², = 32/33.38 = 0.959 m/s, = 0.0469 m. Top width = 24.50 m.
To save cost, the canal is flumed to a rectangular trough of width = 12 m, with the same full supply depth 1.5 m (the trough is as long as the drainage waterway, 100.0 m).
- Trough area = 12 × 1.5 = 18.00 m²; = 32/18.00 = 1.778 m/s (acceptable, < 2.5 m/s); = 0.1611 m
- Froude number = 0.46 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 18.00/15.00 = 1.200 m; friction slope = 0.000558 (Manning's n = 0.015); friction loss in trough = 0.000558 × 100.0 = 0.056 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 24.50 − 12 = 12.5 m
- Outlet length = 3 × (T − B_t)/2 = 18.8 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 213.500 m, so = 213.352 m, = 213.296 m, = 213.353 m. Trough bed = water level − 1.5 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 212.000 | 213.500 |
| 2 | End of inlet transition = start of trough | 211.852 | 213.352 |
| 3 | End of trough = start of outlet transition | 211.796 | 213.296 |
| 4 | End of outlet transition = normal canal | 211.853 | 213.353 |
Total loss of head = 213.500 − 213.353 = 0.147 m, so the canal bed downstream of the work is 0.147 m lower than upstream.
Check: soffit of trough slab (0.6 m thick) = 211.20 m; HFL + free board 0.6 m = 210.60 m. Clearance adequate.
Sketch (section along the drainage)
FSL 213.50 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
bed 212.00 _____________________________ canal trough
|_____________________________| slab 0.6 m
|| || || || || || || || piers
HFL 210.00 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ drainage flow
bed 207.50 _______________________________
<-- 11 spans of 8 m, 100 m -->
Answer: drainage waterway 88 m clear (11 × 8 m, overall 100.0 m); canal flumed to 12 m wide trough; bed/FSL at the four sections = 212.00/213.50, 211.85/213.35, 211.80/213.30, 211.85/213.35 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 50, bed 32 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 400, d 1.55 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450, uplift on roof · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 25, HFD 360 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Hardy-Cross network discharge AB, BC, AD, CD · Water Supply Engineering, chapter 7
- Base width of 20 m high trapezoidal gravity dam · Hydropower Engineering, chapter 4
- Domestic water supply and drainage systems · Building Technology, chapter 12
All Irrigation and Drainage Engineering chapter 8 questions →