- Asked 2/21
- 2073 Bhadra · 8 marks
Critical DO deficit, city 100 l/s
Short answer
Critical DO deficit is 9.23 mg/l at 1.50 days (89.9 km downstream). Mixed BOD5=44.55 mg/l, ultimate BOD=65.15 mg/l, initial deficit=3.33 mg/l. Minimum DO would be negative, indicating anaerobic conditions without treatment.
A city is discharging sewage of 100 l/s in the river having discharge of 1000 l/s and a velocity of 60 km/day. The BOD5 of sewage and river water are 450 mg/l and 4 mg/l respectively. The DO of sewage is zero. The DO in river is 70% of saturation DO value. And, the saturation DO at 20°C is 9.17 mg/l. Take deoxygenation constant (K1) = 0.1/day (base 10) and reaeration constant (k2) = 0.5/day (base 10). Calculate the value of critical DO deficit.
River DO mg/l. Rates are base 10: /day, /day, so . Flows are in l/s.
Step 1: Conditions just after mixing
Step 2: Ultimate BOD and self-purification constant
Step 3: Critical time and critical deficit
Answer: critical DO deficit mg/l (at days, about 89.9 km downstream at 60 km/day). The lowest DO is mg/l.
Note: the computed deficit is larger than the saturation DO (9.17 mg/l). In reality DO cannot fall below zero, so the stream would go anaerobic near the critical point and the effluent needs treatment before discharge. The negative value is simply what the formula gives for these data.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Time of critical DO deficit, 50 l/s city · Sanitary Engineering, chapter 6 · asked 2×
- Critical DO deficit, 300 l/s into river · Sanitary Engineering, chapter 6
- DO deficit 60 km downstream, 2 m³/s stream · Sanitary Engineering, chapter 6 · asked 2×
- Critical DO deficit, location, sag curve · Sanitary Engineering, chapter 6
- DO deficit 50 km downstream, 1.9 m³/s stream · Sanitary Engineering, chapter 6 · asked 2×
- Critical oxygen deficit and location (table 2) · Sanitary Engineering, chapter 6
- Critical oxygen deficit and location (table) · Sanitary Engineering, chapter 6
- Critical DO deficit and location downstream · Environment and Pollution Control, chapter 4
- Conductor selection, 100 MW 70 km 132 kV · Transmission and Distribution System Design, chapter 4
- 70 km, 40 MW line: regulation and zero-regulation pf · Power System Analysis I, chapter 6
- Capacitor for zero regulation, 70 km 220 kV line · Power System Analysis I, chapter 6