- 2072 Asoj · 4 marks
Design discharge from given data
Short answer
Peak sewage is 0.2083 m3/s using 80 lpcd and peak factor 3. Storm runoff with C=0.40, i=30.4 mm/hr, A=800 ha is 27.022 m3/s. Total design discharge is 27.231 m3/s.
Calculate the design discharge for a sewer from the following data: Projected population = 75,000 Area = 8 km² Rate of w/s = 100 lpcd Permeability factor = 60% Rainfall duration = 15 minutes Time of flow = 15 minutes Time of entry = 5 minutes Assume that 80% supplied water converted as wastewater and maximum demand is 3 times average demand.
The design discharge of a combined sewer is the peak sanitary sewage plus the storm water runoff.
Assumptions
- Permeability 60% means the area is 40% impervious, so .
- Rainfall intensity for the given storm duration of 15 min is taken from mm/hr (assumed empirical formula, in min).
- Time of concentration min (the storm of 15 min is used for intensity as given).
Step 1: Sanitary sewage
Average sewage = 80% of 100 lpcd = 80 lpcd. Peak = 3 x average.
Step 2: Storm water
Area ha.
Step 3: Design discharge
Answer: Design discharge = 27.231 m³/s (storm water 27.022 m³/s plus sewage 0.2083 m³/s). If the examination supplies its own intensity formula, replace and the same steps apply.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Sewer diameter for a 2.5 sq km area · Sanitary Engineering, chapter 3
- Design discharge of rural combined sewer · Sanitary Engineering, chapter 2
- Sewer diameter for a 12 sq km area · Sanitary Engineering, chapter 3
- Circular combined sewer, 60 ha · Sanitary Engineering, chapter 3
- Minimum sewer diameter, 80000 population · Sanitary Engineering, chapter 3
- Combined circular sewer, 35 ha · Sanitary Engineering, chapter 3
- Design pipes RA and AB; 200 lpcd, peak factor 3 · Water Supply Engineering, chapter 7
- Design pipes AB and BC, 20,000 population, f = 0.04 · Water Supply Engineering, chapter 7
- Design pipes AB and BC, 75 lpcd, tank 6 m high · Water Supply Engineering, chapter 7
- Design pipes AB, BC; 160 lpcd, peak factor 3 · Water Supply Engineering, chapter 7