Skip to main content

Design discharge from given data

Short answer

Peak sewage is 0.2083 m3/s using 80 lpcd and peak factor 3. Storm runoff with C=0.40, i=30.4 mm/hr, A=800 ha is 27.022 m3/s. Total design discharge is 27.231 m3/s.

Calculate the design discharge for a sewer from the following data: Projected population = 75,000 Area = 8 km² Rate of w/s = 100 lpcd Permeability factor = 60% Rainfall duration = 15 minutes Time of flow = 15 minutes Time of entry = 5 minutes Assume that 80% supplied water converted as wastewater and maximum demand is 3 times average demand.

The design discharge of a combined sewer is the peak sanitary sewage plus the storm water runoff.

Assumptions

  • Permeability 60% means the area is 40% impervious, so C=1−0.60=0.40C=1-0.60=0.40.
  • Rainfall intensity for the given storm duration of 15 min is taken from i=760t+10i=\dfrac{760}{t+10} mm/hr (assumed empirical formula, tt in min).
  • Time of concentration tc=te+tf=5+15=20t_c=t_e+t_f=5+15=20 min (the storm of 15 min is used for intensity as given).

Step 1: Sanitary sewage

Average sewage = 80% of 100 lpcd = 80 lpcd. Peak = 3 x average.

Qsewage=75000×100×0.8×386400×1000=0.2083 m3/sQ_{sewage}=\frac{75000\times100\times0.8\times3}{86400\times1000}=0.2083\ \text{m}^3/\text{s}

Step 2: Storm water

Area A=8 km2=800A=8\ \text{km}^2=800 ha.

i=76015+10=30.40 mm/hrQstorm=C i A360=0.40×30.40×800360=27.022 m3/s\begin{aligned} i&=\frac{760}{15+10}=30.40\ \text{mm/hr}\\ Q_{storm}&=\frac{C\,i\,A}{360}=\frac{0.40\times30.40\times800}{360}=27.022\ \text{m}^3/\text{s} \end{aligned}

Step 3: Design discharge

Q=Qsewage+Qstorm=0.2083+27.022=27.231 m3/sQ=Q_{sewage}+Q_{storm}=0.2083+27.022=27.231\ \text{m}^3/\text{s}

Answer: Design discharge = 27.231 m³/s (storm water 27.022 m³/s plus sewage 0.2083 m³/s). If the examination supplies its own intensity formula, replace ii and the same steps apply.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Sanitary Engineering chapter 2 questions →