Separate sewer, 0.6 full, 250000 persons

Short answer

Design flow = (250000×200×0.8×2.25)/(86400×1000) = 1.0417 m³/s. With Q/Q_f=0.6718 at 0.6 depth, Q_f=1.5505 m³/s; from Manning's, D=1.188 m (adopt 1200 mm). At slope 1 in 600, velocity = 1.51 m/s.

Design a sewer running 0.6 times full at maximum discharge for a town provided with the separate system serving a population of 250,000 persons. Water is from the water-work at a rate of 200 lpcd. Take a constant value of n = 0.013 at all depths of flow. The permissible slope is 1 in 600. Take peak factor of 2.25.

Design flow

Assume 80% of the water supplied reaches the sewer. Peak factor = 2.25.

Qmax=250000×200×0.8×2.2586400×1000=1.0417 m3/sQ_{max}=\frac{250000\times200\times0.8\times2.25}{86400\times1000}=1.0417\ \text{m}^3/\text{s}

Data: S=1/600S=1/600, n=0.013n=0.013 (constant), depth ratio d/D=0.6d/D=0.6.

For d/D=0.6d/D=0.6: θ=2cos⁡−1(1−2d/D)=203.07∘\theta = 2\cos^{-1}(1-2d/D)=203.07^\circ, A/Af=θ−sin⁡θ2π=0.6265A/A_f=\dfrac{\theta-\sin\theta}{2\pi}=0.6265, R/Rf=1−sin⁡θθ=1.1106R/R_f=1-\dfrac{\sin\theta}{\theta}=1.1106, so v/vf=(R/Rf)2/3=1.0724v/v_f=(R/R_f)^{2/3}=1.0724 and Q/Qf=(A/Af)(v/vf)=0.6718Q/Q_f=(A/A_f)(v/v_f)=0.6718 (n taken constant).

Size of the sewer

Discharge when running full:

Qf=QQ/Qf=1.04170.6718=1.5505 m3/sQ_f=\frac{Q}{Q/Q_f}=\frac{1.0417}{0.6718}=1.5505\ \text{m}^3/\text{s}

Manning's formula for a full circular pipe, Qf=0.3117nD8/3S1/2Q_f=\dfrac{0.3117}{n}D^{8/3}S^{1/2}, with S=0.00167S=0.00167 and n=0.013n=0.013:

D=(Qf n0.3117 S1/2)3/8=(1.5505×0.0130.3117×0.04082)3/8=1.188 mD=\left(\frac{Q_f\,n}{0.3117\,S^{1/2}}\right)^{3/8}=\left(\frac{1.5505\times0.013}{0.3117\times0.04082}\right)^{3/8}=1.188\ \text{m}

Adopt the next standard size, D = 1200 mm.

Check of velocity and capacity

For the adopted pipe: vf=0.3969nD2/3S1/2=1.408v_f=\dfrac{0.3969}{n}D^{2/3}S^{1/2}=1.408 m/s and Qf=1.5917Q_f=1.5917 m³/s.

v=vf×(v/vf)=1.408×1.0724=1.51 m/sQcapacity=Qf×(Q/Qf)=1.5917×0.6718=1.0694 m3/s (≥1.0417)\begin{aligned} v&=v_f\times(v/v_f)=1.408\times1.0724=1.51\ \text{m/s}\\ Q_{capacity}&=Q_f\times(Q/Q_f)=1.5917\times0.6718=1.0694\ \text{m}^3/\text{s}\ (\ge 1.0417) \end{aligned}

The velocity at maximum flow, 1.51 m/s, lies between the minimum (0.6 m/s) and the maximum non-scouring limit (3.0 m/s), so it is satisfactory.

Answer: Provide a circular sewer of D = 1200 mm at slope 1 in 600; it runs 0.6 full with v = 1.51 m/s at Q = 1.0417 m³/s (computed diameter 1.188 m). Such a large flow may also be carried by two parallel sewers.