Settling basin 30 m³/s with Velikanov check

Short answer

For 30 m³/s trapping >0.2 mm (w=0.02 m/s), v=0.197 m/s, depth 5 m. Two chambers 15.5 m wide; turbulence length 117 m, Velikanov 120 m, adopt 125 m. Dimensions: 2 chambers 15.5 m × 125 m × 5 m.

Find the dimensions of the settling basin for a high head project of a Himalayan river which carries a discharge of 30 m³/s and a gross head of 100 m. The sediment size to be removed is up to 0.20 mm and fall velocity ω = 2 cm/sec. If the turbulence is considered, what will be the dimension of the basin? Check the length of the settling basin using Velikanov's method given correction factor λ = 1.5.

Given: design discharge Q=30.0Q=30.0 m³/s and gross head 100 m; particles of size d≥0.20d\ge 0.20 mm to be trapped, fall velocity w=2.00w=2.00 cm/s =0.0200=0.0200 m/s (given). The length is first found without turbulence, then with turbulence, and finally checked by Velikanov's method (λ=1.5\lambda=1.5).

Step 1: Horizontal velocity (Camp)

For 0.1<d<10.1<d<1 mm, v=adv=a\sqrt d with a=44a=44 (v in cm/s, d in mm):

v=440.20=19.68 cm/s=0.1968 m/sv=44\sqrt{0.20}=19.68\ \text{cm/s}=0.1968\ \text{m/s}

This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.

Step 2: Cross-section and width

Assume a flow depth H=5.0H=5.0 m in the settling zone (sediment storage is extra).

B=QvH=30.00.1968×5.0=30.49 mB=\frac{Q}{vH}=\frac{30.0}{0.1968\times5.0}=30.49\ \text{m}

Provide n=2n=2 chambers so that one can be flushed while the other works: b=B/n=15.25b=B/n=15.25 m each, adopt 15.5 m.

Step 3: Length without turbulence

L0=vHw=0.1968×5.00.0200=49.2 mL_0=\frac{vH}{w}=\frac{0.1968\times5.0}{0.0200}=49.2\ \text{m}

Step 4: Effect of turbulence

Turbulence reduces the effective fall velocity: w′=w−αw'=w-\alpha, with α=0.132 v/H\alpha=0.132\,v/\sqrt{H}.

α=0.132×0.19685.0=0.0116 m/sw′=0.0200−0.0116=0.0084 m/sL=vHw′=0.1968×5.00.0084=117.4 m\begin{aligned} \alpha&=\frac{0.132\times0.1968}{\sqrt{5.0}}=0.0116\ \text{m/s}\\ w'&=0.0200-0.0116=0.0084\ \text{m/s}\\ L&=\frac{vH}{w'}=\frac{0.1968\times5.0}{0.0084}=117.4\ \text{m} \end{aligned}

Step 5: Check by Velikanov's method

LV=λ2v2(H−0.2)27.51 w2=1.52×0.19682×(5.0−0.2)27.51×0.02002=120.2 mL_V=\frac{\lambda^2v^2(\sqrt H-0.2)^2}{7.51\,w^2}=\frac{1.5^2\times0.1968^2\times(\sqrt{5.0}-0.2)^2}{7.51\times0.0200^2}=120.2\ \text{m}

The Velikanov length (120.2 m) is 2% greater than the turbulence length (117.4 m). The larger of the two is adopted and rounded up to 125 m.

Adopted dimensions

ItemValue
Flow velocity vv0.197 m/s
Settling depth HH5.0 m (plus about 1.0 m sediment storage in the hopper)
Number of chambers2
Width of each chamber15.5 m
Length of settling zone125 m
Length/width ratio8.1
Inlet transitiongradual, with guide vanes (side slope not steeper than about 1:5)

Total volume of water in the basin ≈19375\approx 19375 m³.

PLAN (flushing gates at the downstream end)
          inlet        settling chambers      outlet
 canal   transition  +=================+   transition
 =====>  \         / |  chamber 1      | \         /===> to
         /  guide  \ +-----------------+ /  weir   \    headrace
 =====>  \  vanes  / |  chamber 2      | \         /
         /         \ +=================+ /         \
  trash-                  |  |  flush gates
  rack                    v  v  --> flushing channel --> river
LONGITUDINAL SECTION
 inlet          settling zone (depth H)      outlet
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~  WL
 \    --->   --->   --->   --->   --->   --->  |
  \  ______________________________________   | weir
   \/   sediment storage / hopper slope 1:30 \__|__ to headrace
          flush gate -> flushing channel -> river

Flushing arrangement: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is maintained in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chamber continues to supply the plant.

Answer: 2 chambers, each about 15.5 m wide x 125 m long x 5.0 m deep (settling zone), with v=0.197v=0.197 m/s.