Optimization of hydraulic tunnel diameter

Short answer

Select trial diameters; compute annualized pipe cost and annual cost of lost energy (hf ∝ Q²L/D⁵). Total cost minimum gives optimum; for cost Cc = k D^m, Ce = a D⁻⁵, Dopt = [5a/(m·k·CRF)]^(1/(m+5)). Check velocity 2.5–4 m/s.

How do you carry out the optimization of a hydraulic tunnel (how can the diameter of a power tunnel in a hydropower project be optimized using cost-benefit analysis)? Explain.

The diameter of a power tunnel is chosen so that the net benefit (value of the energy saved minus the cost of the tunnel) is highest. A small diameter is cheap but gives a high velocity, a high head loss and less energy; a large diameter costs more but loses less head.

Step by step procedure

  1. Select several trial diameters D1,D2,…D_1, D_2, \dots (e.g. 3.0, 3.5, 4.0, 4.5, 5.0 m) for the design flow QQ and the tunnel length LL.
  2. Head loss for each: hf=f LDV22gh_f=\dfrac{f\,L}{D}\dfrac{V^2}{2g} (or Manning), with V=4QπD2V=\dfrac{4Q}{\pi D^2}, so hf∝Q2LD5h_f\propto\dfrac{Q^2L}{D^5}. Add the minor losses.
  3. Power and energy loss: Ploss=ρgQhfηP_{loss}=\rho g Q h_f\eta, and the annual energy loss is Eloss=Ploss×8760×PFE_{loss}=P_{loss}\times8760\times PF (PF = plant factor; the variation of QQ over the flow-duration curve should be included).
  4. Annual cost of the lost energy: CE=Eloss×tariffC_E=E_{loss}\times\text{tariff} (loss of income). Add the cost of the lost capacity.
  5. Capital cost of the tunnel for each diameter: excavation, support, lining and grouting, usually of the form Cc=k DmC_c=k\,D^{m} (with mm about 1.2-2). Convert it to an annual cost: CA=Cc×CRF+O&MC_A=C_c\times CRF+\text{O\&M}, where CRF is the capital recovery factor for the given interest rate and life.
  6. Total annual cost: CT(D)=CA(D)+CE(D)C_T(D)=C_A(D)+C_E(D).
  7. Optimum diameter: the diameter at which CTC_T is minimum, i.e. where dCAdD+dCEdD=0\dfrac{dC_A}{dD}+\dfrac{dC_E}{dD}=0; or the diameter at which the incremental benefit/cost ratio (extra energy value / extra annual cost) just exceeds 1. Plot CAC_A, CEC_E and CTC_T against DD and read off the minimum.

If Cc=kDmC_c=kD^{m} and CE=a D−5C_E=a\,D^{-5}, then

ddD(k CRF Dm+aD−5)=0 ⇒ Dopt=(5am k CRF)1m+5\frac{d}{dD}\left(k\,CRF\,D^{m}+aD^{-5}\right)=0\ \Rightarrow\ D_{opt}=\left(\frac{5a}{m\,k\,CRF}\right)^{\frac{1}{m+5}}
  1. Check the practical limits: velocity (about 2.5-4 m/s for lined pressure tunnels, less for unlined ones), the minimum construction diameter (about 2.5-3 m for TBM or drill and blast), geology and surge conditions.