- 2080 Baishakh · 8 marks
Optimize capacity by marginal cost-benefit
Short answer
Add capacity as long as marginal benefit exceeds marginal cost. Annual cost per kW is about $99, and the step from 604 to 805 kW gives MB < MC, so optimum installed capacity is 604 kW.
A RoR hydropower plant is proposed in a river. Using the marginal cost and benefit method, optimize the installed capacity with the following data: interest rate = 12%; energy price = $0.08/kWh; fixed cost = $60 × 10⁶; variable cost (electro-mechanical) = $650/kW; annual O&M = 3% of variable cost; project life = 35 years.
| % Time | 8.33 | 16.67 | 25.0 | 33.33 | 41.67 | 50.0 | 58.33 | 66.67 | 75.0 | 83.33 | 91.67 | 100 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Power (kW) | 805 | 604 | 564 | 407 | 300 | 167 | 130 | 115 | 96 | 89 | 74 | 65 |
Capacity should be increased as long as the marginal benefit (MB) of the added capacity is at least its marginal cost (MC). The fixed cost ($60 × 10⁶) does not depend on the capacity, so it does not enter the marginal comparison.
Data
- Interest , life years:
- Annual cost of 1 kW of electro-mechanical equipment USD per kW per year
- Energy price = $0.08/kWh
Method
The power duration table gives the percentage of time each power level is equalled or exceeded. Raising the capacity from the next lower power level to the level adds kW, which can be used only for the percentage of time for which that power is available:
| Capacity step (kW) | ΔP (kW) | Time used (%) | ΔE (kWh) | MB ($) | MC ($) | MB/MC |
|---|---|---|---|---|---|---|
| 604 → 805 | 201 | 8.33 | 146,671 | 11,734 | 19,900 | 0.59 |
| 564 → 604 | 40 | 16.67 | 58,412 | 4,673 | 3,960 | 1.18 |
| 407 → 564 | 157 | 25.0 | 343,830 | 27,506 | 15,544 | 1.77 |
| 300 → 407 | 107 | 33.33 | 312,409 | 24,993 | 10,594 | 2.36 |
| 167 → 300 | 133 | 41.67 | 485,489 | 38,839 | 13,168 | 2.95 |
| 130 → 167 | 37 | 50.0 | 162,060 | 12,965 | 3,663 | 3.54 |
| 115 → 130 | 15 | 58.33 | 76,646 | 6,132 | 1,485 | 4.13 |
| 96 → 115 | 19 | 66.67 | 110,966 | 8,877 | 1,881 | 4.72 |
| 89 → 96 | 7 | 75.0 | 45,990 | 3,679 | 693 | 5.31 |
| 74 → 89 | 15 | 83.33 | 109,496 | 8,760 | 1,485 | 5.90 |
| 65 → 74 | 9 | 91.67 | 72,273 | 5,782 | 891 | 6.49 |
| 0 → 65 | 65 | 100 | 569,400 | 45,552 | 6,435 | 7.08 |
Decision
The ratio MB/MC is below 1 for the step 604 → 805 kW (MB = $11,734 < MC = $19,900), so this extra capacity is not worth building. The step 564 → 604 kW has MB/MC = 1.18 (more than 1), so it is justified, and all the lower steps are also justified.
Answer: the optimum installed capacity is 604 kW (the capacity exceeded 16.67% of the time).
(If the curve is interpolated linearly between the 8.33% and 16.67% points, break-even occurs where , i.e. at about 14.1% of the time, which corresponds to about 665 kW; with the tabulated power levels, 604 kW is the answer.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Best installed capacity at 12% interest · Hydro Power, chapter 3
- ROR versus PROR hydropower plants · Power Plant Design, chapter 3