- Asked 2/20
- 2066 Bhadra · 2+6 marks
Intersection control methods; Webster signal 400/300 PCU
Short answer
Methods include signs, channelization, roundabouts, signals, and grade separation. For flows 400 and 300 PCU/h, saturations 1450 and 1150 PCU/h, all-red 12 s, Webster gives optimum cycle 65 s with phase greens 25 s and 24 s and 2 s amber each.
What are different methods of traffic control at an intersection? The average normal flow of traffic on cross roads A and B during design period are 400 and 300 PCU per hour; the saturation flow values on these roads are estimated as 1450 and 1150 PCU per hour respectively. The all-red time required for pedestrian crossing is 12 sec. Design two phase traffic signal by Webster's method.
Methods of traffic control at an intersection
- Uncontrolled (priority by rules): drivers give way to the vehicle on the right or on the main road; suitable for very low volume.
- Traffic signs and markings: STOP and GIVE WAY signs, with stop lines; the minor road gives way to the major road (IRC:67, IRC:35).
- Channelisation: islands and markings guide the movements (IRC:SP:41).
- Rotary (roundabout): one-way circulation, no signals (IRC:65).
- Traffic signals: fixed-time, vehicle-actuated or area-coordinated (IRC:93).
- Police control by hand signals at peak times or special events.
- Grade separation: flyover, underpass or interchange for very high volume.
Design of a two-phase signal by Webster's method
Data: roads A and B carry 400 and 300 PCU/h; saturation flows 1450 and 1150 PCU/h; all-red time for pedestrians = 12 s per cycle.
Step 1: Flow ratios
Flow ratio for each approach; the larger value in a phase is the critical one.
| Phase | Approach | q | s | y = q/s |
|---|---|---|---|---|
| Phase 1 | Road A | 400 | 1450 | 0.276 |
| Phase 2 | Road B | 300 | 1150 | 0.261 |
Step 2: Lost time
An amber of 2 s per phase is assumed and taken as the lost time of that phase; the all-red time = 12 s is also lost.
Step 3: Optimum cycle time (Webster)
Adopt C = 65 s.
Step 4: Green times
Total effective green s, divided in proportion to :
Because the whole amber is counted as lost time, the displayed green equals the effective green (so that ):
| Phase | Effective g (s) | Green G (s) | Amber (s) |
|---|---|---|---|
| Phase 1 | 25.2 | 25 | 2 |
| Phase 2 | 23.8 | 24 | 2 |
Check: 25 + 2 + 24 + 2 + 12 = 65 s.
Phase diagram
| P1 green 25 | A2| P2 green 24 | A2| R 12 |
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Webster signal: roads H and F, 3 s and 4 s headways · Transportation Engineering II, chapter 1 · asked 2×
- Two-phase signal: 400 and 250 PCU/hr, 7 m roads · Transportation Engineering II, chapter 1
- Webster signal: 450 and 350 PCU/hr, all-red 15 s · Transportation Engineering II, chapter 1
- Webster two-phase signal with saturation headways · Transportation Engineering II, chapter 1
- Signal design: roads X 15 m and Y 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: roads A 15 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads A 15 m and B 7 m · Transportation Engineering II, chapter 1