- Asked 2/20
- 2071 Chaitra · 8 marks
Signal timing: roads A 15 m and B 12 m
Short answer
Pedestrian crossing times govern: minimum green for road A (crossing road B) is 15 s, for road B (crossing road A) 18 s. Adopted cycle 38 s: road A green 15 s, amber 3 s; road B green 18 s, amber 2 s. Pedestrian signals show 5 s WALK then flashing clearance for the respective crossing duration.
An isolated signal with pedestrians indication is to be installed on a right angled intersection with road A 15 m wide and road B 12 m wide. The heaviest volume per hour for each lane of road A and road B are 300 and 250 respectively. The amber times for roads A and B are 3 and 2 seconds respectively. Design the timings of traffic and pedestrian signal.
Isolated two-phase signal with pedestrian indications for road A (15 m) and road B (12 m). Approach speeds are not needed because the ambers are given (3 s and 2 s).
Design basis (IRC:93-1985, Guidelines on Design and Installation of Road Traffic Signals, with Webster's method): two-phase signal, Phase 1 = road A moves, Phase 2 = road B moves. Pedestrians cross a road while the traffic on the cross road has green. Assumed (not given): saturation flow 1800 PCU/h per lane, start-up lost time 2 s per phase, pedestrian walking speed 1.2 m/s and initial walk (pedestrian start-up) time 5 s.
Step 1: Amber (change) time
Amber times are given: road A = 3 s, road B = 2 s.
Step 2: Pedestrian crossing time
Time to cross = initial walk + width / walking speed:
Pedestrians crossing road A walk during Phase 2, so the Phase 2 green must be at least 17.5 s. Pedestrians crossing road B walk during Phase 1, so the Phase 1 green must be at least 15.0 s.
Step 3: Webster cycle time from traffic
With s of effective green:
Step 4: Check against pedestrian needs
| Phase | Green from traffic (s) | Pedestrian minimum (s) | Adopted green (s) |
|---|---|---|---|
| 1 (road A) | 11.6 | 15.0 | 15 |
| 2 (road B) | 10.0 | 17.5 | 18 |
The pedestrian requirement governs. Adopted cycle length s.
Final timings
| Signal | Phase 1: road A | Phase 2: road B |
|---|---|---|
| Vehicle green | 15 s | 18 s |
| Vehicle amber | 3 s | 2 s |
| Vehicle red | 20 s | 18 s |
Pedestrian signals: pedestrians crossing road B get WALK for 5 s, then flashing (clearance) for 10 s during Phase 1 (total 15 s of the 15 s green); pedestrians crossing road A get WALK for 5 s, then flashing for 13 s during Phase 2 (total 18 s of the 18 s green). All pedestrian indications show DON'T WALK (red man) while their cross traffic moves.
Phase diagram
Cycle = 38 s
Road A: [GREEN 15][A 3][ RED 20 ]
Road B: [ RED 18 ][GREEN 18][A 2]
Ped crossing B: [WALK+FLASH 15][DON'T WALK 23]
Ped crossing A: [DON'T WALK 18][WALK+FLASH 18][DW 2]
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Signal timing: roads H 12 m and F 9.6 m · Transportation Engineering II, chapter 1 · asked 3×
- Signal timing: roads A 18 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads A 15 m and B 7 m · Transportation Engineering II, chapter 1
- Signal timing: roads A 14.4 m and B 12 m · Transportation Engineering II, chapter 1
- Signal timing: roads P 13.5 m and Q 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: Road 1 14 m, Road 2 7 m · Transportation Engineering II, chapter 1
- Signal timing: roads P 14 m and Q 10.5 m · Transportation Engineering II, chapter 1