- 2078 Bhadra · 8 marks
Signal timing: roads A 14.4 m and B 12 m
Short answer
Use Webster method with amber times 4 s for road A and 3 s for road B. Pedestrian minimums are 15 s for road B and 17 s for road A, giving adopted greens 15 s and 17 s and a 39 s cycle.
At right angled crossing of road A and road B isolated signal with pedestrain indicators is to be installed. The road A is 14.4m wide and road B is 12m wide and the peak hour volumes are 280 and 230 PCU per hour and the approach speeds are 50 and 35 kmph respectively. Design the vehicular and pedestrian signal timing.
Isolated two-phase signal with pedestrian indicators for road A (14.4 m) and road B (12 m). Flows of 280 and 230 PCU/h are taken as the heaviest flow per lane.
Design basis (IRC:93-1985, Guidelines on Design and Installation of Road Traffic Signals, with Webster's method): two-phase signal, Phase 1 = road A moves, Phase 2 = road B moves. Pedestrians cross a road while the traffic on the cross road has green. Assumed (not given): saturation flow 1800 PCU/h per lane, start-up lost time 2 s per phase, pedestrian walking speed 1.2 m/s and initial walk (pedestrian start-up) time 5 s.
Step 1: Amber (change) time
Amber with reaction time s and comfortable deceleration , kept within the IRC:93 range of 2-4 s:
Step 2: Pedestrian crossing time
Time to cross = initial walk + width / walking speed:
Pedestrians crossing road A walk during Phase 2, so Phase 2 green must be at least 17.0 s. Pedestrians crossing road B walk during Phase 1, so Phase 1 green must be at least 15.0 s.
Step 3: Webster cycle time from traffic
Step 4: Check against pedestrian needs
| Phase | Green from traffic (s) | Pedestrian minimum (s) | Adopted green (s) |
|---|---|---|---|
| 1 (road A) | 12.4 | 15.0 | 15 |
| 2 (road B) | 10.6 | 17.0 | 17 |
Adopted cycle length s.
Final timings
| Signal | Phase 1: road A | Phase 2: road B |
|---|---|---|
| Vehicle green | 15 s | 17 s |
| Vehicle amber | 4 s | 3 s |
| Vehicle red | 20 s | 19 s |
Pedestrian signals: pedestrians crossing road B get WALK for 5 s then flashing (clearance) for 10 s during Phase 1 (total 15 s of 15 s green); pedestrians crossing road A get WALK for 5 s then flashing for 12 s during Phase 2 (total 17 s of 17 s green). All pedestrian indications show DON'T WALK (red man) while their cross traffic moves.
Phase diagram
Cycle = 39 s
Road A: [GREEN 15][A 4][ RED 20 ]
Road B: [ RED 19 ][GREEN 17][A 3]
Ped crossing B: [WALK+FLASH 15][DON'T WALK 24]
Ped crossing A: [DON'T WALK 19][WALK+FLASH 17][DW]
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Signal timing: roads A 18 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads A 15 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads P 14 m and Q 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: roads H 12 m and F 9.6 m · Transportation Engineering II, chapter 1 · asked 3×
- Signal timing: roads P 13.5 m and Q 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: Road 1 14 m, Road 2 7 m · Transportation Engineering II, chapter 1
- First product of inertia of right-angled triangle · Strength of Materials, chapter 2
- Hill road earthwork, chainage 130-280 · Estimating and Costing, chapter 6