- Asked 3/20
- 2070 Chaitra · 8 marks
Signal timing: roads H 12 m and F 9.6 m
Short answer
Using Webster’s method with given ambers, pedestrian crossing times (H: 15 s, F: 13 s), and saturation flow 1800 PCU/h/lane, cycle length 45 s. Road H: green 21 s, amber 5 s; Road F: green 15 s, amber 4 s. Pedestrian WALK 5 s plus clearance for each phase.
An isolated signal with pedestrians indication is to be installed on a right angled intersection with road H of 12 m wide and road F of 9.6 m wide. The heaviest volume per hour for each lane of H and F are 475 and 325 respectively. The approach speeds are 60 and 45 kmph for road H and road F respectively. Design the timings of traffic and pedestrian signals. Assume amber times for road H and road F as 5 and 4 secs respectively.
Isolated two-phase signal with pedestrian indications for road H (12 m) and road F (9.6 m). The ambers are given (5 s and 4 s), so the approach speeds are not needed for them.
Design basis (IRC:93-1985, Guidelines on Design and Installation of Road Traffic Signals, with Webster's method): two-phase signal, Phase 1 = road H moves, Phase 2 = road F moves. Pedestrians cross a road while the traffic on the cross road has green. Assumed (not given): saturation flow 1800 PCU/h per lane, start-up lost time 2 s per phase, pedestrian walking speed 1.2 m/s and initial walk (pedestrian start-up) time 5 s.
Step 1: Amber (change) time
Amber times are given: road H = 5 s, road F = 4 s.
Step 2: Pedestrian crossing time
Time to cross = initial walk + width / walking speed:
Pedestrians crossing road H walk during Phase 2, so Phase 2 green must be at least 15.0 s. Pedestrians crossing road F walk during Phase 1, so Phase 1 green must be at least 13.0 s.
Step 3: Webster cycle time from traffic
Step 4: Check against pedestrian needs
| Phase | Green from traffic (s) | Pedestrian minimum (s) | Adopted green (s) |
|---|---|---|---|
| 1 (road H) | 20.5 | 13.0 | 21 |
| 2 (road F) | 14.6 | 15.0 | 15 |
Adopted cycle length s.
Final timings
| Signal | Phase 1: road H | Phase 2: road F |
|---|---|---|
| Vehicle green | 21 s | 15 s |
| Vehicle amber | 5 s | 4 s |
| Vehicle red | 19 s | 26 s |
Pedestrian signals: pedestrians crossing road F get WALK for 5 s then flashing (clearance) for 8 s during Phase 1 (total 13 s of 21 s green); pedestrians crossing road H get WALK for 5 s then flashing for 10 s during Phase 2 (total 15 s of 15 s green). All pedestrian indications show DON'T WALK (red man) while their cross traffic moves.
Phase diagram
Cycle = 45 s
Road H: [GREEN 21][A 5][ RED 19 ]
Road F: [ RED 26 ][GREEN 15][A 4]
Ped crossing F: [WALK+FLASH 21][DON'T WALK 24]
Ped crossing H: [DON'T WALK 26][WALK+FLASH 15][DW]
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Signal timing: roads A 18 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads A 15 m and B 12 m · Transportation Engineering II, chapter 1 · asked 2×
- Signal timing: roads A 14.4 m and B 12 m · Transportation Engineering II, chapter 1
- Signal timing: roads A 15 m and B 7 m · Transportation Engineering II, chapter 1
- Signal timing: roads P 13.5 m and Q 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: roads P 14 m and Q 10.5 m · Transportation Engineering II, chapter 1
- Signal timing: Road 1 14 m, Road 2 7 m · Transportation Engineering II, chapter 1
- Signal design: roads X 15 m and Y 10.5 m · Transportation Engineering II, chapter 1