Transformer sizing and 11 kV feeder SLD
Short answer
Size the transformer by plant maximum demand: sum (connected kVA × demand factor) divided by diversity factor plus20-25% margin. Example: 120 kVA(0,7), 20 kVA(0,9), 40 kVA(0,6) sum 126 kVA; /1,3 =96,9 kVA; +20% =116,3 kVA →160 kVA. SLD: 11 kV feeder, LA, AB switch, DO fuse, 11/0.4 kV Dyn11, LT MCCB, MDB, MCCB to SDB, MCB/RCCB to230 V.
Explain with example, how does the proper size of transformer determined for a industry. Draw single diagram of electrical connection of 11KV feeder up to end user at 230 V.
Determining the proper transformer size
The transformer is sized on the maximum demand, not on connected load:
- List all connected loads in kVA (kVA = kW / (η·pf)).
- Apply demand factor (or Ku) to each load group to get its maximum demand.
- Divide the sum of group maximum demands by the diversity factor (or multiply by Ks).
- Add 20–25 % for future expansion.
- Choose the next higher standard rating (50, 100, 160, 200, 250, 315, 400 kVA ...).
Example: an industry has motors 120 kVA (demand factor 0.7), lighting 20 kVA (DF 0.9) and other loads 40 kVA (DF 0.6); diversity factor 1.3.
Max demands: 120×0.7 = 84, 20×0.9 = 18, 40×0.6 = 24
Sum = 126 kVA
Plant max demand = 126 / 1.3 = 96.92 kVA
With 20 % margin = 96.92 × 1.2 = 116.31 kVA
Selected: 160 kVA, 11/0.4 kV transformer.
Single line diagram: 11 kV feeder to 230 V end user
11 kV feeder
|
[LA] lightning arrester
|
[AB] isolator
|
[DO] HT fuse
|
(TR) 11/0.4 kV, Dyn11
|
[MCCB] LT main + meter
|
=== MDB 400 V ===
|
[MCCB] -> SDB (400/230 V)
|
[MCB + RCCB]
|
230 V end user (phase-neutral)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Single line diagram from 11 kV to end use · Industrial Power Distribution and Illumination, chapter 4 · asked 3×
- Types of substation and 11 kV SLD · Industrial Power Distribution and Illumination, chapter 4 · asked 3×
- Transformer size for given industry (figure) · Industrial Power Distribution and Illumination, chapter 4 · asked 2×
- Substation classification and 11 kV schematic · Industrial Power Distribution and Illumination, chapter 4
- Transformer selection for apartment, residence, industry · Industrial Power Distribution and Illumination, chapter 4
- Transformer size for four blocks · Industrial Power Distribution and Illumination, chapter 4
- Capacitor size, four-node 11 kV feeder · Transmission and Distribution System Design, chapter 7 · asked 5×
- Capacitor size, feeder with 500 kVA end load · Transmission and Distribution System Design, chapter 7 · asked 5×
- Loss and drop, 15 km 11 kV feeder · Transmission and Distribution System Design, chapter 7 · asked 2×
- Power loss, 10 km 11 kV UDL feeder · Transmission and Distribution System Design, chapter 7 · asked 2×
All Industrial Power Distribution and Illumination chapter 4 questions →