Skip to main content

Footing for 30x35 cm column, M25

Short answer

Provide a 3.2 m × 1.9 m footing, 650 mm thick. Reinforcement: along length, 12 mm bars @ 140 mm c/c; along width, central band with 17 bars of 12 mm @ 110 mm c/c and each outer strip with 5 bars of 12 mm @ 130 mm c/c.

Design a footing for a rectangular column of size 30 cm x 35 cm reinforced with 8-20 mm dia. bars. The column is subjected to a factored axial load and moment of 1000 kN and 80 kN-m, respectively. The allowable bearing capacity of soil is 140 kN/m2^2. At a depth of 1.6 m. Use M25 concrete and TMT bars for column and footing both. Sketch all of the reinforcement required.

Data and assumptions

  • Column 350 mm × 300 mm (long side a=350a=350 mm along the footing length); footing concrete M25, steel Fe500; column concrete M25; column bars 8-20 mm.
  • Given loads are factored: Pu=1000P_u = 1000 kN, Mu=80M_u = 80 kN·m. Service loads = factored / 1.5: P=666.7P = 666.7 kN, M=53.3M = 53.3 kN·m.
  • Allowable (safe) bearing capacity of soil = 140 kN/m² at 1.6 m depth.
  • TMT bars taken as Fe500.
  • Clear cover 50 mm for the footing (IS 456 cl. 26.4.2.2); effective depth d=D−60d = D - 60 mm (cover + half bar). Load factor 1.5.

Size of footing

Weight of footing and backfill is taken as 10% of the column load.

Areq=1.1 Pqa=1.1×666.7140=5.24 m2A_{req} = \frac{1.1\,P}{q_a} = \frac{1.1 \times 666.7}{140} = 5.24\ \text{m}^2

Eccentricity e=M/P=53.3/666.7=0.080e = M/P = 53.3/666.7 = 0.080 m, which is less than L/6L/6, so there is no tension under the base. The size is chosen so that

qmax=1.1PBL(1+6eL)≤qaq_{max} = 1.1\frac{P}{BL}\left(1 + \frac{6e}{L}\right) \le q_a

Try L×B=3.2×1.9L \times B = 3.2 \times 1.9 m (A=6.08A = 6.08 m²): qmax=138.7q_{max} = 138.7 kN/m² ≤140.0\le 140.0 and qmin=102.5q_{min} = 102.5 kN/m² >0> 0. Safe.

Factored soil pressure

Pu=1.5×666.7=1000.0P_u = 1.5 \times 666.7 = 1000.0 kN, Mu=80.0M_u = 80.0 kN·m. pu=PuBL(1±6eL)p_u = \dfrac{P_u}{BL}\left(1 \pm \dfrac{6e}{L}\right): pu,max=189.1p_{u,max} = 189.1 kN/m², pu,min=139.8p_{u,min} = 139.8 kN/m² (average 164.5 kN/m²). Self-weight does not cause bending in the footing, so it is excluded.

Bending moments and reinforcement

Cantilever projections from the column face: along LL: (3200−350)/2=1425(3200 - 350)/2 = 1425 mm; along BB: (1900−300)/2=800(1900 - 300)/2 = 800 mm. Along LL (critical section at the column face on the side of maximum pressure, linear pressure): Mu,L=B[pfx22+(pmax−pf)x23]M_{u,L} = B\left[p_f\dfrac{x^2}{2} + (p_{max}-p_f)\dfrac{x^2}{3}\right], with pf=167.2p_f = 167.2 kN/m² at the face and x=1.425x = 1.425 m: Mu,L=350.7M_{u,L} = 350.7 kN·m. Along BB (average pressure): Mu,B=168.4M_{u,B} = 168.4 kN·m. Required depth for flexure: Mu,lim=0.133fckbd2M_{u,lim} = 0.133 f_{ck} b d^2 is far larger than the moment for d=590d = 590 mm, so the depth is governed by shear (one-way or punching). Trial D=650D = 650 mm, d=590d = 590 mm, found by the shear checks below.

Ast=0.5fckfy[1−1−4.6Mufckbd2]bdA_{st} = \dfrac{0.5 f_{ck}}{f_y}\left[1 - \sqrt{1 - \dfrac{4.6 M_u}{f_{ck} b d^2}}\right] b d; minimum steel = 0.12% of bDbD.

DirectionMuM_u (kN·m)AstA_{st} req (mm²)ProvideAstA_{st} prov (mm²)
Along LL (width BB)350.71482 (minimum)12 mm @ 140 c/c1535
Along BB (width LL)168.4249612 mm @ 140 c/c2585

For the rectangular footing, the short-direction steel is placed in a central band of width B=1900B = 1900 mm in the proportion 2β+1=21.68+1=0.745\dfrac{2}{\beta+1} = \dfrac{2}{1.68+1} = 0.745 (IS 456 cl. 34.3.1), where β=L/B\beta = L/B.

  • Central band: 0.745×2496=18600.745 \times 2496 = 1860 mm² → 12 mm @ 110 mm c/c (17 bars).
  • Each outer strip (650 mm wide): remaining steel 318 mm² or minimum 0.12% = 507 mm², whichever is more → 12 mm @ 130 mm c/c (5 bars).

Check for one-way shear (at distance dd from the column face)

  • Along LL side: Vu=289.9V_u = 289.9 kN, τv=VuBd=0.259\tau_v = \dfrac{V_u}{B d} = 0.259 MPa; pt=0.137%p_t = 0.137\%, τc=0.291\tau_c = 0.291 MPa (IS 456 Table 19, SP 16 formula). τv<τc\tau_v < \tau_c, safe.
  • Along BB side: Vu=110.5V_u = 110.5 kN, τv=0.059\tau_v = 0.059 MPa; pt=0.137%p_t = 0.137\%, τc=0.291\tau_c = 0.291 MPa. Safe.

Check for two-way (punching) shear (at d/2d/2 from the column face)

  • Perimeter bo=2[(a+d)+(c+d)]=2[(350+590)+(300+590)]=3660b_o = 2[(a + d) + (c + d)] = 2[(350+590) + (300+590)] = 3660 mm
  • Vu=Pu−pu(a+d)(c+d)=1000.0−164.5×0.940×0.890=862.4V_u = P_u - p_u (a+d)(c+d) = 1000.0 - 164.5 \times 0.940 \times 0.890 = 862.4 kN (average pressure; the effect of moment transfer is neglected).
  • τv=Vubod=0.399\tau_v = \dfrac{V_u}{b_o d} = 0.399 MPa; ks=0.5+βc=1.00k_s = 0.5 + \beta_c = 1.00, τc′=ks×0.25fck=1.250\tau_c' = k_s \times 0.25\sqrt{f_{ck}} = 1.250 MPa. τv<τc′\tau_v < \tau_c', safe.

Development length

Ld=0.87fyϕ4τbdL_d = \dfrac{0.87 f_y \phi}{4\tau_{bd}}, τbd=2.24\tau_{bd} = 2.24 MPa (M25, deformed bars): 12 mm bars (both directions) → Ld=583L_d = 583 mm. Available length from column face (less 50 mm end cover): 1375 mm along LL, 750 mm along BB. Satisfied in both directions.

Bearing stress and transfer of load from column

Column area A2=350×300=0.105A_2 = 350\times300 = 0.105 m². Bearing stress =Pu/A2=9.52= P_u/A_2 = 9.52 MPa. Permissible bearing stress: column concrete 0.45fck=11.250.45 f_{ck} = 11.25 MPa; footing concrete 0.45fckA1/A20.45 f_{ck}\sqrt{A_1/A_2} with A1/A2≤2\sqrt{A_1/A_2} \le 2 gives up to 22.50 MPa. The lesser, 11.25 MPa, governs. Capacity of bearing = 1181 kN ≥\ge Pu=1000P_u = 1000 kN, so the whole load can be transferred by bearing. Provide minimum dowels of 0.5% of column area = 525 mm²: use 8 bars of 20 mm (2513 mm²) as dowels, same as column bars. Dowel length in compression Ldc=0.87fyϕ4×1.25 τbd=777L_{dc} = \dfrac{0.87 f_y\phi}{4 \times 1.25\,\tau_{bd}} = 777 mm (and the same lap with the column bars). Available depth in footing = 650 - 50 - 24 = 576 mm <Ldc< L_{dc}; dowels are bent at the bottom with 90° bends.

Detailing

PLAN                      ELEVATION
+------------------+      col
| #  #  #  #  #  # |      | |
| #  +------+  #  # |     _|_|__
| #  | col  |  #  # |    |_____|  <- D = 650 mm
| #  +------+  #  # |    bars both ways
| #  #  #  #  #  # |
+------------------+
 L = 3.2 m, B = 1.9 m
  • Bottom mesh: 12 mm @ 140 c/c along LL (lower layer); along BB (upper layer), 12 mm @ 110 c/c in the central 1.9 m band and 12 mm @ 130 c/c in each outer strip, 50 mm clear cover; dowels 8-20 mm.

Answer: Footing 3.2 m × 1.9 m × 650 mm thick; 12 mm @ 140 c/c along the length; along the width, 12 mm @ 110 c/c in the central 1.9 m band and 12 mm @ 130 c/c in the outer strips.

✓ Answer checked by Claude Opus 5.5 (high effort)