- 2082 Baishakh · 7 marks
Design of orifice type intake
Short answer
Net area 6.25 m2, gross 6.44 m2; adopt opening 5.4 m by 1.2 m in two bays, sill 1.0 m above bed. Required head is 0.084 m, less than 0.3 m available; trash rack loss about 0.0067 m.
Design an orifice type intake for a ROR plant having design discharge of 5 m³/s. The difference of elevations between the weir crest level and the river bed level is 2.5 m. The difference of elevations between the weir crest level and the designed canal water surface level is 0.3 m. The intake velocity is limited to 0.8 m/s. Take coefficient of discharge as 0.6, coefficient of contraction as 0.03, and coefficient of trash rack bar as 1.83.
Given: m³/s; weir crest is 2.5 m above the river bed; canal water level is 0.3 m below the crest; intake velocity m/s; ; bar-contraction coefficient 0.03; trash-rack bar shape factor .
Step 1: Net opening area from the velocity limit
Step 2: Gross area allowing for the bars
The bars reduce the opening by the contraction coefficient 0.03:
Step 3: Dimensions of the opening
Sill level 1.0 m above the river bed (to keep bed load out). Take the height of the orifice m so that its top is at 2.2 m above the bed, i.e. at the canal water level (0.3 m below the crest), so the opening stays submerged.
Adopted opening area m².
Step 4: Head required across the orifice (check)
Available head difference m m, so the opening can pass the design flow; the extra head is absorbed by throttling the gate.
For comparison, the area that would pass 5 m³/s under the full 0.3 m head is m², so the velocity limit (6.25 m²) controls the size.
Step 5: Trash rack loss (Kirschmer)
Assume bars 10 mm thick at 50 mm clear spacing, inclined at :
SECTION PLAN
crest 2.5 ~~~~~~~~~~~~ river ==>
| |gate| 2.2 |rack|gate|--> canal
rack |## | |~~~~ canal | 5.4 m opening |
sill |___|____| 2 bays of 2.7 m
1.0 m above bed
Answer: orifice opening m with sill 1.0 m above the bed (2 bays of 2.7 m); required head m < 0.3 m available; rack loss m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design of side intake with trashrack · Hydropower Engineering, chapter 5
- Phreatic line and discharge (crest 300 masl) · Hydropower Engineering, chapter 4 · asked 2×
- RoR headworks sketch; intake importance and location · Hydropower Engineering, chapter 5
- Control of bed load and floating debris at intake · Hydropower Engineering, chapter 5
- Gravity dam equilibrium and overtopping discharge coefficient · Hydropower Engineering, chapter 4
- Parts of pressurized and non-pressurized RoR intake · Hydropower Engineering, chapter 5
- Weir waterway and crest levels, 16000 m3/s · Irrigation and Drainage Engineering, chapter 5
- Water surface over hump with contraction · Hydraulics, chapter 7
- Intake site selection for RoR plant · Hydro Power, chapter 5
- Orifice plate flow in hydropower canal · Fluid Mechanics, chapter 6