Design of orifice type intake

Short answer

Net area 6.25 m2, gross 6.44 m2; adopt opening 5.4 m by 1.2 m in two bays, sill 1.0 m above bed. Required head is 0.084 m, less than 0.3 m available; trash rack loss about 0.0067 m.

Design an orifice type intake for a ROR plant having design discharge of 5 m³/s. The difference of elevations between the weir crest level and the river bed level is 2.5 m. The difference of elevations between the weir crest level and the designed canal water surface level is 0.3 m. The intake velocity is limited to 0.8 m/s. Take coefficient of discharge as 0.6, coefficient of contraction as 0.03, and coefficient of trash rack bar as 1.83.

Given: Q=5Q=5 m³/s; weir crest is 2.5 m above the river bed; canal water level is 0.3 m below the crest; intake velocity ≤0.8\le0.8 m/s; Cd=0.6C_d=0.6; bar-contraction coefficient 0.03; trash-rack bar shape factor β=1.83\beta=1.83.

Step 1: Net opening area from the velocity limit

Anet=QV=50.8=6.25 m2A_{net}=\frac{Q}{V}=\frac{5}{0.8}=6.25\ \text{m}^2

Step 2: Gross area allowing for the bars

The bars reduce the opening by the contraction coefficient 0.03:

Agross=Anet1−0.03=6.250.97=6.44 m2A_{gross}=\frac{A_{net}}{1-0.03}=\frac{6.25}{0.97}=6.44\ \text{m}^2

Step 3: Dimensions of the opening

Sill level 1.0 m above the river bed (to keep bed load out). Take the height of the orifice h=1.2h=1.2 m so that its top is at 2.2 m above the bed, i.e. at the canal water level (0.3 m below the crest), so the opening stays submerged.

b=Agrossh=6.441.2=5.37 m ⇒ adopt 5.4 m (2 bays of 2.7 m)b=\frac{A_{gross}}{h}=\frac{6.44}{1.2}=5.37\ \text{m}\ \Rightarrow\ \text{adopt }5.4\ \text{m (2 bays of 2.7 m)}

Adopted opening area A=1.2×5.4=6.48A=1.2\times5.4=6.48 m².

Step 4: Head required across the orifice (check)

Q=CdA2g Δh ⇒ Δh=12g(QCdA)2=119.62(50.6×6.48)2=0.084 mQ=C_dA\sqrt{2g\,\Delta h}\ \Rightarrow\ \Delta h=\frac{1}{2g}\left(\frac{Q}{C_dA}\right)^2=\frac{1}{19.62}\left(\frac{5}{0.6\times6.48}\right)^2=0.084\ \text{m}

Available head difference =0.3=0.3 m >0.084>0.084 m, so the opening can pass the design flow; the extra head is absorbed by throttling the gate.

For comparison, the area that would pass 5 m³/s under the full 0.3 m head is A=50.62g(0.3)=3.43A=\dfrac{5}{0.6\sqrt{2g(0.3)}}=3.43 m², so the velocity limit (6.25 m²) controls the size.

Step 5: Trash rack loss (Kirschmer)

Assume bars 10 mm thick at 50 mm clear spacing, inclined at 75∘75^\circ:

ht=β(sb)4/3V22gsin⁡θ=1.83(1050)4/30.8219.62sin⁡75∘=0.0067 mh_t=\beta\left(\frac{s}{b}\right)^{4/3}\frac{V^2}{2g}\sin\theta=1.83\left(\frac{10}{50}\right)^{4/3}\frac{0.8^2}{19.62}\sin75^\circ=0.0067\ \text{m}
 SECTION                         PLAN
 crest 2.5 ~~~~~~~~~~~~          river ==>
        |   |gate|  2.2         |rack|gate|--> canal
  rack  |## |    |~~~~ canal    | 5.4 m opening |
 sill   |___|____|              2 bays of 2.7 m
 1.0 m above bed

Answer: orifice opening 5.4 m×1.25.4\ \text{m}\times1.2 m with sill 1.0 m above the bed (2 bays of 2.7 m); required head 0.0840.084 m < 0.3 m available; rack loss ≈0.0067\approx0.0067 m.