- 2069 Chaitra · 6 marks
Control of bed load and floating debris at intake
Short answer
Bed load is excluded by placing the intake sill 1.0–1.5 m above the river bed, an undersluice with divide wall to flush gravel, and a gravel trap. Floating debris is controlled by an angled trash boom, a trash rack with 50–100 mm spacing, and low approach velocity (0.6–1.0 m/s) to prevent clogging.
How is the control of bed load and floating debris in a ROR intake done? Explain with appropriate plan and sectional drawings of the system.
In a RoR plant on a steep Himalayan river, bed load (gravel, boulders) and floating debris (logs, leaves, trash) must be kept out of the intake. This is done by the arrangement shown below.
PLAN
river ====================================>
scour sluice (undersluice) ||||||| weir
+---+====================+
| flood divide wall |
| wall --> gravel trap |--> canal to
| rack|gate | settling basin
+---------------------------+
trash boom o-o-o-o (angled)
SECTION (through intake)
pond ~~~~~~~~~~~~~~~~~~~~~~~~~~~~
boom o | rack |gate|
|###\ | |==> canal
sill 1.0-1.5 m above undersluice floor
//// undersluice floor (low) //// --> flushing
Control of bed load
- High intake sill: the intake floor is placed 1.0-1.5 m (or more) above the undersluice crest or river bed, so the bed load rolls past.
- Undersluice (scouring sluice) next to the intake, with gates, creates a flushing channel in front of it; it is opened during floods to scour deposits, and the divide wall separates the intake from the sluice.
- Intake location on the outer bank of the bend, where the secondary flow moves bed load to the inner bank.
- Curtain (skimming) wall or bed-load excluder: only the upper clear water is drawn.
- Gravel trap after the intake with flushing arrangement, and a settling basin for sand.
- Guide bunds and training walls keep a stable flow line near the intake.
Control of floating debris
- Trash boom (floating or fixed), set at an angle to the flow, deflects logs and trash towards the weir spill or sluice.
- Trash rack (clear spacing about 50-100 mm) with an automatic or manual rake, inclined at about 75°.
- Skimming walls and a surface spillway pass the floating material over the weir.
- Low velocity at the rack (0.6-1.0 m/s) so the debris does not hold on the bars.
- Periodic inspection and cleaning in the monsoon.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR headworks sketch; intake importance and location · Hydropower Engineering, chapter 5
- Parts of pressurized and non-pressurized RoR intake · Hydropower Engineering, chapter 5
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3
- Three alternative RoR layouts · Hydropower Engineering, chapter 2
- Design of orifice type intake · Hydropower Engineering, chapter 5
- What is an intake? Functions and sketch · Hydropower Engineering, chapter 5 · asked 2×
- Intake site selection for RoR plant · Hydro Power, chapter 5
- Interconnected system load-frequency and Q-V control · Power System Analysis II, chapter 1
- Guide bund components and drawings, 6000 m3/s · Irrigation and Drainage Engineering, chapter 6
- Speed control by inertia and load damping · Power Plant Equipment, chapter 2 · asked 6×