- 2070 Chaitra · 8 marks
Design pipelines AB and BC, C = 100, 10 m head
Short answer
Use Hazen-Williams equation with C=100. Pipe AB (1.3 lps, 2750 m) adopts 65 mm and pipe BC (0.65 lps, 1700 m) adopts 40 mm. Residual heads are 14.16 m at B and 11.32 m at C.
A layout of water distribution is shown in the figure below. Design pipelines AB and BC considering Hazen-William's Coefficient = 100. Minimum pressure required at B and C is 10 m of water.
[Figure: River source near A, RL = 950 m; A to B: discharge 1.3 lps, L = 2750 m, RL of B = 920 m; B to C: L = 1700 m, RL of C = 894 m.]
C = 100; minimum residual pressure at B and C = 10 m. HGL at A = 950 m. The discharge in BC is not given in the figure; it is assumed that half of the 1.3 lps is used at B, so BC carries 0.65 lps (if the actual discharge is known, substitute it in the same steps).
Method
Use the Hazen-Williams equation in SI units:
with in m³/s, and in m. For each pipe the available head is (HGL at upstream end − ground RL of the tap − required residual head). The gradient gives the calculated diameter, the next larger commercial size is adopted, and the real head loss and residual head are then checked. Commercial sizes (nominal bore): 15, 20, 25, 32, 40, 50, 65, 80, 100, 125, 150, 200 mm and so on. Constant C = 100.
Pipe AB
- Discharge lps, length m
- HGL at A = 950.00 m; ground RL at B = 920 m; residual head required = 10 m
- Available head m
- Gradient
- From : mm, adopt commercial size 65 mm
- Actual m, HGL at B = 934.16 m, residual head = 14.16 m (≥ 10 m, OK)
- Velocity m/s
Pipe BC
- Discharge lps, length m
- HGL at B = 934.16 m; ground RL at C = 894 m; residual head required = 10 m
- Available head m
- Gradient
- From : mm, adopt commercial size 40 mm
- Actual m, HGL at C = 905.32 m, residual head = 11.32 m (≥ 10 m, OK)
- Velocity m/s
Summary
| Pipe | Q (lps) | L (m) | Calc. D (mm) | Adopted D (mm) | h_f (m) | Residual (m) | v (m/s) |
|---|---|---|---|---|---|---|---|
| AB | 1.3 | 2750 | 62.0 | 65 | 15.84 | 14.16 | 0.39 |
| BC | 0.65 | 1700 | 39.6 | 40 | 28.85 | 11.32 | 0.52 |
Answer: AB = 65 mm and BC = 40 mm (GI), with residual heads of 14.2 m at B and 11.3 m at C.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design pipelines AB, BC and CD, C = 120 · Water Supply Engineering, chapter 7
- Design pipes AB and BC, source RL 1050 m · Water Supply Engineering, chapter 7
- Design pipes AB and BC, source RL 180 m · Water Supply Engineering, chapter 7
- Design pipelines AB, BC, AD; 1 kg/cm2 at tap · Water Supply Engineering, chapter 7
- Design pipes AB and BC, A RL 210 m, 44 and 18 lps · Water Supply Engineering, chapter 7
- Design pipes AB, BC; 160 lpcd, peak factor 3 · Water Supply Engineering, chapter 7
- River crossing: minimum clearance above water · Transmission and Distribution System Design, chapter 4
- Settling basin with Hazen coefficient and sediment depth · Hydropower Engineering, chapter 5
- Water pipe thickness from pressure head · Strength of Materials, chapter 5