Design pipelines AB and BC, C = 100, 10 m head

Short answer

Use Hazen-Williams equation with C=100. Pipe AB (1.3 lps, 2750 m) adopts 65 mm and pipe BC (0.65 lps, 1700 m) adopts 40 mm. Residual heads are 14.16 m at B and 11.32 m at C.

A layout of water distribution is shown in the figure below. Design pipelines AB and BC considering Hazen-William's Coefficient = 100. Minimum pressure required at B and C is 10 m of water.

[Figure: River source near A, RL = 950 m; A to B: discharge 1.3 lps, L = 2750 m, RL of B = 920 m; B to C: L = 1700 m, RL of C = 894 m.]

C = 100; minimum residual pressure at B and C = 10 m. HGL at A = 950 m. The discharge in BC is not given in the figure; it is assumed that half of the 1.3 lps is used at B, so BC carries 0.65 lps (if the actual discharge is known, substitute it in the same steps).

Method

Use the Hazen-Williams equation in SI units:

hf=10.67 L Q1.852C1.852D4.87h_f = \frac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}

with QQ in m³/s, LL and DD in m. For each pipe the available head is (HGL at upstream end − ground RL of the tap − required residual head). The gradient S=H/LS = H/L gives the calculated diameter, the next larger commercial size is adopted, and the real head loss and residual head are then checked. Commercial sizes (nominal bore): 15, 20, 25, 32, 40, 50, 65, 80, 100, 125, 150, 200 mm and so on. Constant C = 100.

Pipe AB

  • Discharge Q=1.300Q = 1.300 lps, length L=2750L = 2750 m
  • HGL at A = 950.00 m; ground RL at B = 920 m; residual head required = 10 m
  • Available head H=950.00−920−10=20.00H = 950.00 - 920 - 10 = 20.00 m
  • Gradient S=H/L=20.00/2750=0.00727S = H/L = 20.00/2750 = 0.00727
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=62.0D_{calc} = 62.0 mm, adopt commercial size 65 mm
  • Actual hf=15.836h_f = 15.836 m, HGL at B = 934.16 m, residual head = 14.16 m (≥ 10 m, OK)
  • Velocity v=Q/A=0.39v = Q/A = 0.39 m/s

Pipe BC

  • Discharge Q=0.650Q = 0.650 lps, length L=1700L = 1700 m
  • HGL at B = 934.16 m; ground RL at C = 894 m; residual head required = 10 m
  • Available head H=934.16−894−10=30.16H = 934.16 - 894 - 10 = 30.16 m
  • Gradient S=H/L=30.16/1700=0.01774S = H/L = 30.16/1700 = 0.01774
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=39.6D_{calc} = 39.6 mm, adopt commercial size 40 mm
  • Actual hf=28.847h_f = 28.847 m, HGL at C = 905.32 m, residual head = 11.32 m (≥ 10 m, OK)
  • Velocity v=Q/A=0.52v = Q/A = 0.52 m/s

Summary

PipeQ (lps)L (m)Calc. D (mm)Adopted D (mm)h_f (m)Residual (m)v (m/s)
AB1.3275062.06515.8414.160.39
BC0.65170039.64028.8511.320.52

Answer: AB = 65 mm and BC = 40 mm (GI), with residual heads of 14.2 m at B and 11.3 m at C.