- 2073 Bhadra · 10 marks
Primary and secondary energy (Nepali calendar months)
Short answer
Primary energy is 3836.2 GWh/yr, secondary 7867.7 GWh/yr. Minimum usable flow after 40 m³/s env. release is 360 m³/s; firm power 437.9 MW. Total energy 11,703.9 GWh/yr using all usable flow.
Following table shows the mean monthly flow of a typical river of Nepal. Estimate the primary and secondary energies available in the river throughout the year. Assume 10% of minimum flow of the series has to be released for environmental flow to the downstream from the dam. Take overall efficiency of the plant is 80% and effective head is 155 m. Note: The months are as per Nepalese calendar i.e 1 as Baishakh and so on.
| Month | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m³/s) | 1150 | 1140 | 1450 | 1830 | 1700 | 1550 | 1150 | 1000 | 850 | 400 | 480 | 960 |
Primary energy is the energy available throughout the year from the minimum usable flow; secondary energy is the extra energy from usable flows above that minimum. No design discharge is given, so the plant is assumed to use all the usable flow. Each month is taken as 730 h (Nepali months vary from 29 to 32 days, but the yearly total is the same).
Environmental flow
Minimum flow of the series = 400 m³/s (month 10, Magh).
Usable flow = Q − 40.
Power per unit discharge
Primary energy
Minimum usable flow = 400 − 40 = 360 m³/s.
Total energy
| Month | Q | Usable Q | Power (MW) |
|---|---|---|---|
| 1 Baisakh | 1150 | 1110 | 1350.25 |
| 2 Jestha | 1140 | 1100 | 1338.08 |
| 3 Asar | 1450 | 1410 | 1715.18 |
| 4 Shrawan | 1830 | 1790 | 2177.43 |
| 5 Bhadra | 1700 | 1660 | 2019.29 |
| 6 Ashwin | 1550 | 1510 | 1836.82 |
| 7 Kartik | 1150 | 1110 | 1350.25 |
| 8 Mangsir | 1000 | 960 | 1167.78 |
| 9 Poush | 850 | 810 | 985.32 |
| 10 Magh | 400 | 360 | 437.92 |
| 11 Falgun | 480 | 440 | 535.23 |
| 12 Chaitra | 960 | 920 | 1119.12 |
| Sum | 13,180 |
Answer: Primary energy ≈ 3836.2 GWh/yr; secondary energy ≈ 7867.7 GWh/yr (total ≈ 11,703.9 GWh/yr).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Primary and secondary energy with 10% environmental flow · Hydro Power, chapter 3
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Power duration curve and primary/secondary energy · Hydro Power, chapter 3
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3
- Primary and secondary energy (102 m head) · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Monthly energy loss in four secondary lines · Transmission and Distribution System Design, chapter 7
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×