- 2077 Chaitra · 1+7 marks
Firm power and plant load factors
Short answer
Firm power is continuously available from minimum flow; secondary power is surplus above firm. Installed capacity: 44,000 kW, plant factor: 53.4%, maximum demand: 35,000 kW, load factor: 67.1%, utilization factor: 79.5%.
Define firm power and secondary power. The load on a hydropower plant varies from a minimum of 12,000 kW to a maximum of 35,000 kW. Two turbo-generators of capacities 22,000 kW each have been installed. Calculate: (i) total installed capacity of the plant, (ii) plant factor, (iii) maximum demand, (iv) load factor, and (v) utilization factor.
Firm and secondary power
- Firm (primary) power is the power that is available continuously (100% of the time), even in the driest period. It is fixed by the minimum flow.
- Secondary (surplus) power is the power above firm power that is available only part of the time, when flow is higher than the minimum. It is sold at a lower rate or used for non-essential loads.
Data
Minimum load = 12,000 kW; maximum load = 35,000 kW; two units of 22,000 kW each. The load is assumed to vary linearly (uniformly) between minimum and maximum, so the average load is the mean of the two.
(i) Total installed capacity
(ii) Plant factor (capacity factor)
(iii) Maximum demand
Maximum demand = peak load = 35,000 kW.
(iv) Load factor
(v) Utilization factor
Check: .
| Quantity | Value |
|---|---|
| Installed capacity | 44,000 kW |
| Plant factor | 53.4% |
| Maximum demand | 35,000 kW |
| Load factor | 67.1% |
| Utilization factor | 79.5% |
Answer: 44,000 kW; 53.4%; 35,000 kW; 67.1%; 79.5%.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Best installed capacity at 12% interest · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3
- Power duration curve and primary/secondary energy · Hydro Power, chapter 3
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- Fault level: two 40 MVA generators, 2 Ω feeder · Power Plant Equipment, chapter 4 · asked 5×