- 2074 Bhadra · 6 marks
Zones and backup for breaker 7 failure
Short answer
Zones: bus A (1,2,3), line AB1 (2,4), line AB2 (3,5), bus B (4,5,6,7), line BC (7,8), load 1 (6), load 2 (8). If breaker 7 fails, breaker-failure relay trips 4,5,6; load 1 is interrupted. To avoid interruption, use double-bus with bus coupler or two series breakers on BC, so bus B remains healthy and load 1 stays fed.
Consider the system portion shown in figure below. (i) Sketch the zone of protection. (ii) Describe a possible backup scheme for failure of breaker 7 for a fault on line BC; is load 1 interrupted? (iii) Describe a means of clearing a fault on line BC without a momentary interruption of load 1. [Figure: Bus A is fed through breaker 1. Two parallel lines run from bus A to bus B: the upper line has breaker 2 at A and breaker 4 at B, the lower line has breaker 3 at A and breaker 5 at B. Load 1 is supplied from bus B through breaker 6. Line BC leaves bus B through breaker 7 and reaches bus C, from which Load 2 is supplied through breaker 8.]
Assumption: breakers 1–8 are as described; each line has a breaker at both ends and bus B connects breakers 4, 5, 6 and 7.
(i) Zones of protection
[1]
┌─────┼──────── Bus A zone ──────┐
│ ───┴──┬──────────────┬─── │
└────────┼──────────────┼────────┘
[2] [3]
┌ Line AB1 ┐ ┌ Line AB2 ┐
│ │ │ │ │ │
└───[4]────┘ └───[5]────┘
┌────────┼──────────────┼────────┐
│ ──────┴───┬──────┬───┴── │ Bus B zone
└───────────[6]────[7]───────────┘
Load 1 ┌──┼────────┐ Line BC
│ │ │ zone
└─[8]───────┘
│ Bus C / Load 2
Each zone overlaps its neighbours at
every breaker (1,2,3,4,5,6,7,8).
Zones: bus A (1, 2, 3); line AB-1 (2, 4); line AB-2 (3, 5); bus B (4, 5, 6, 7); line BC (7, 8); load 1 feeder (6); load 2 / bus C (8).
(ii) Back-up for failure of breaker 7 (fault on line BC)
- Normally relays of line BC trip breakers 7 and 8.
- If breaker 7 fails to open, the fault is still fed from bus B.
- Local back-up (breaker failure protection): after about 150–200 ms, the breaker-failure relay of 7 trips all other breakers connected to bus B: 4, 5 and 6.
- Remote back-up (alternative): zone-2/zone-3 distance relays or time-graded overcurrent relays at bus A trip 2 and 3.
- In both cases bus B is de-energised, so load 1 is interrupted (in the local scheme breaker 6 is tripped; in the remote scheme bus B loses supply).
(iii) Clearing BC fault without momentary interruption of load 1
The fault current from bus B must be interrupted by a breaker other than the one that isolates load 1. Possible means:
- Provide two breakers in series on the BC line at B (or a breaker-and-a-half / ring bus arrangement), so that if breaker 7 fails the second breaker clears the fault and bus B remains healthy.
- Use a double-bus with bus coupler arrangement: line BC and load 1 on different buses; the breaker-failure relay of 7 trips only the bus coupler and the breakers of BC's bus.
With these arrangements a fault on BC, even with a stuck breaker, is removed without de-energising the bus that supplies load 1.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Ring bus rearrangement and zones · Switchgear and Protection, chapter 1
- Protection requirements; protective system vs scheme · Switchgear and Protection, chapter 1
- Requirements, coordination and protection zone · Switchgear and Protection, chapter 1
- Methods of providing backup protection · Switchgear and Protection, chapter 1
- Fault clearing process with trip circuit · Switchgear and Protection, chapter 1
- Zones of protection and their rules · Switchgear and Protection, chapter 1 · asked 2×
- Critical clearing time and angle, fault at P · Power System Analysis II, chapter 6
- Critical clearing angle/time, fault at infinite bus · Power System Analysis II, chapter 6
- Fault at load end of overhead line · Power System Analysis II, chapter 3
- Critical clearing, fault at infinite bus, H = 6 · Power System Analysis II, chapter 6