- 2080 Baishakh · 4 marks
Gross and net potential between two sections
Short answer
Gross potential is computed by summing 9.81 Q_i ΔH_i for sub‑reaches using mean flows and head drops. Net potential uses design discharge from the flow duration curve after environmental release, net head (gross minus hydraulic losses) and overall turbine‑generator efficiency (∼0.8–0.9): P_net = 9.81 η Q_d H_n (kW).
How do you estimate the gross and net hydropower potential between two sections of a river?
Gross potential is the theoretical power of the river between two sections, using all the flow and the full head difference with 100% efficiency. Net potential is the power that can actually be developed after deducting head loss, efficiency and the part of the flow that cannot be used.
Gross potential
Divide the reach into small sub-reaches where the flow is nearly constant (the flow increases downstream with tributaries and catchment area). For each sub-reach:
where is the mean flow (m³/s) and is the drop in elevation (m) of the sub-reach. Annual energy = kWh. Flow comes from the flow series at the two sections (area-ratio method for ungauged sites), and elevations from topographic maps or survey.
Net (technical/economic) potential
- Choose the design discharge from the flow duration curve (e.g. for RoR), after leaving the environmental flow.
- Net head , where includes the intake, desander, waterway and penstock losses (about 5-10% of gross head).
- Overall efficiency of the turbine, generator and transformer (about 80-90%).
- Annual energy is found from the monthly flows up to . Economic potential is the part for which benefit-cost ratio is greater than one.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Powerhouse plan and sections (Francis, 10 MW) · Hydropower Engineering, chapter 8
- Hydropower intake sketch; minimizing head loss · Hydropower Engineering, chapter 5
- Desander design, two basins (16 m³/s) · Hydropower Engineering, chapter 5
- Forebay design (14.5 m³/s, two penstocks) · Hydropower Engineering, chapter 6
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Range and SD of two quiz sections · Probability and Statistics, chapter 1 · asked 2×
- Preliminary estimate: two-storied health post · Estimating and Costing, chapter 3
- Preliminary estimate: two-storied VDC office · Estimating and Costing, chapter 3
- Two-tone AM: net modulation index, power, spectrum · Communication Systems, chapter 2 · asked 2×