Design: 4000 kVA 66/11 kV power transformer

Short answer

Core: d = 436.8 mm, a = 371.3 mm, b = 231.5 mm. Frame: H = 1605.6 mm, W = 1854.5 mm, depth = 371.3 mm. Per-unit resistance drop ≈ 0.005, leakage reactance drop ≈ 0.048. Per-unit voltage regulation at 0.8 pf lag ≈ 0.033 (3.3%).

For a 4000 kVA, 3 phase, 50 Hz, 66 kV/11 kV, delta/delta, core type, oil immersed natural cooled power transformer the design data are: Max flux density in core = 1.6 Wb/m²; Constant for output voltage per turn = 0.6; Resistivity of copper = 0.021 Ω-mm²/m; Core type = Cruciform; Current density in conductors = 2.5 A/mm²; Window space factor = 0.22; Stacking factor = 0.9; Ratio of window height to width = 2.75; Take hot rolled steel and area of yoke is 20% greater than area of core; Width of duct between LV and core = 10 mm; Width of LV winding = 50 mm; Width of HV winding = 50 mm; Width of duct between LV and HV = 20 mm. Assuming all the other required parameters, calculate: (i) Overall core dimension (ii) Overall dimension of frame (iii) Per unit resistance and leakage reactance drop (iv) Per unit voltage regulation at 0.8 pf

Standard method (A.K. Sawhney). Assumptions: hot-rolled steel, yoke area = 1.2 × core area, yoke depth = largest stamping width, ρ=0.021 Ω\rho = 0.021\ \Omega-mm²/m, end clearance 50 mm at each end of the 66 kV winding.

(i) Overall core dimensions

Voltage per turn, Et=KQE_t = K\sqrt{Q} (QQ in kVA, total for 3 phases):

Et=0.64000=37.947 Vϕm=Et4.44f=37.9474.44×50=0.17093 WbAi=ϕmBm=0.170931.6=0.10683 m2=1068.3 cm2\begin{aligned} E_t &= 0.6\sqrt{4000} = 37.947\ \text{V}\\ \phi_m &= \frac{E_t}{4.44f} = \frac{37.947}{4.44\times50} = 0.17093\ \text{Wb}\\ A_i &= \frac{\phi_m}{B_m} = \frac{0.17093}{1.6} = 0.10683\ \text{m}^2 = 1068.3\ \text{cm}^2 \end{aligned}

For a cruciform (two-stepped) core with stacking factor 0.9, Ai=0.56d2A_i = 0.56d^2 (standard ratio, Sawhney):

d=Ai0.56=0.106830.56=0.4368 m=436.8 mma=0.85d=371.3 mmb=0.53d=231.5 mm\begin{aligned} d &= \sqrt{\frac{A_i}{0.56}} = \sqrt{\frac{0.10683}{0.56}} = 0.4368\ \text{m} = 436.8\ \text{mm}\\ a &= 0.85d = 371.3\ \text{mm}\\ b &= 0.53d = 231.5\ \text{mm} \end{aligned}

Gross core area Agi=Ai/0.9=0.11870A_{gi} = A_i/0.9 = 0.11870 m².

Output equation (three phase): Q=3.33fBmδKwAwAi×10−3Q = 3.33fB_m\delta K_wA_wA_i\times10^{-3}

Aw=Q3.33fBmδKwAi×10−3=40003.33×50×1.6×2.5×106×0.22×0.10683×10−3=0.25554 m2Ww=Aw2.75=304.8 mm,Hw=2.75Ww=838.3 mmD=d+Ww=741.6 mm (distance between adjacent limb centres)\begin{aligned} A_w &= \frac{Q}{3.33fB_m\delta K_wA_i\times10^{-3}}\\ &= \frac{4000}{3.33\times50\times1.6\times2.5\times10^6\times0.22\times0.10683\times10^{-3}}\\ &= 0.25554\ \text{m}^2\\ W_w &= \sqrt{\frac{A_w}{2.75}} = 304.8\ \text{mm},\quad H_w = 2.75W_w = 838.3\ \text{mm}\\ D &= d + W_w = 741.6\ \text{mm (distance between adjacent limb centres)} \end{aligned}

Yoke

Yoke area 20% more than core area (hot-rolled steel, to reduce yoke loss and magnetising current). Yoke depth = width of largest stamping:

Ay=1.2Ai=0.12820 m2,Agy=Ay0.9=0.14244 m2Dy=a=371.3 mmHy=AgyDy=0.142440.3713=383.7 mm\begin{aligned} A_y &= 1.2A_i = 0.12820\ \text{m}^2,\quad A_{gy} = \frac{A_y}{0.9} = 0.14244\ \text{m}^2\\ D_y &= a = 371.3\ \text{mm}\\ H_y &= \frac{A_{gy}}{D_y} = \frac{0.14244}{0.3713} = 383.7\ \text{mm} \end{aligned}

(ii) Overall dimensions of frame

H=Hw+2Hy=838.3+2(383.7)=1605.6 mmW=2D+a=2(741.6)+371.3=1854.5 mmDepth=Dy=a=371.3 mm\begin{aligned} H &= H_w + 2H_y = 838.3 + 2(383.7) = 1605.6\ \text{mm}\\ W &= 2D + a = 2(741.6) + 371.3 = 1854.5\ \text{mm}\\ \text{Depth} &= D_y = a = 371.3\ \text{mm} \end{aligned}
 +-----------------------------+  ---
 |          top yoke           |   ^
 +-----+-----+-----+-----+-----+   |
 |limb |     |limb |     |limb |   |
 |  R  | Ww  |  Y  | Ww  |  B  |   H
 |     |     |     |     |     |   |
 +-----+-----+-----+-----+-----+   |
 |         bottom yoke         |   v
 +-----------------------------+  ---
 |<------------ W ------------>|
    |<--- D --->|<--- D --->|

(iii) Per unit resistance and leakage reactance drop

Turns and conductors (both windings delta):

Phase voltages: LV (delta) VLV=11000.0V_{LV} = 11000.0 V; HV (delta) VHV=66000.0V_{HV} = 66000.0 V.

Phase currents: ILV=Q3VLV=121.21I_{LV} = \frac{Q}{3V_{LV}} = 121.21 A; IHV=20.202I_{HV} = 20.202 A.

TLV=VLVEt=11000.037.947=289.88≈290Et (revised)=11000.0290=37.931 VTHV=TLVVHVVLV=1740.0≈1740aLV=ILVδ=48.48 mm2,aHV=IHVδHV=8.081 mm2\begin{aligned} T_{LV} &= \frac{V_{LV}}{E_t} = \frac{11000.0}{37.947} = 289.88 \approx 290\\ E_t\ (\text{revised}) &= \frac{11000.0}{290} = 37.931\ \text{V}\\ T_{HV} &= T_{LV}\frac{V_{HV}}{V_{LV}} = 1740.0 \approx 1740\\ a_{LV} &= \frac{I_{LV}}{\delta} = 48.48\ \text{mm}^2,\quad a_{HV} = \frac{I_{HV}}{\delta_{HV}} = 8.081\ \text{mm}^2 \end{aligned}

Winding dimensions

Radial build (given clearance between core and LV = 10 mm):

ItemInside dia (mm)Outside dia (mm)
LV winding456.8556.8
HV winding596.8696.8

Radial depths: b1=50b_1 = 50 mm (LV), b2=50b_2 = 50 mm (HV), duct a=20a = 20 mm. Axial length Lc=Hw−2(50)=738.3L_c = H_w - 2(50) = 738.3 mm.

Mean lengths of turn:

Lmt,LV=π456.8+556.82=1.5921 mLmt,HV=π596.8+696.82=2.0319 mLmt=π456.8+696.82=1.8120 m (both windings, for reactance)\begin{aligned} L_{mt,LV} &= \pi\frac{456.8 + 556.8}{2} = 1.5921\ \text{m}\\ L_{mt,HV} &= \pi\frac{596.8 + 696.8}{2} = 2.0319\ \text{m}\\ L_{mt} &= \pi\frac{456.8 + 696.8}{2} = 1.8120\ \text{m (both windings, for reactance)} \end{aligned}

Check: HV outside diameter 697 mm < DD = 742 mm, leaving about 45 mm between adjacent HV coils.

Per unit resistance

Resistance referred to HV, with ρ=0.021 Ω-mm2/m\rho = 0.021\ \Omega\text{-mm}^2/\text{m} (copper at about 75 °C):

rHV=ρTHVLmt,HVaHV=0.021×1740×2.03198.081=9.1879 ΩrLV=0.021×290×1.592148.48=0.19998 ΩRp=rHV+rLV(THVTLV)2=9.1879+0.19998(1740290)2=16.387 Ωεr=IHVRpVHV=20.2×16.38766000.0=0.00502 p.u.\begin{aligned} r_{HV} &= \frac{\rho T_{HV}L_{mt,HV}}{a_{HV}} = \frac{0.021\times1740\times2.0319}{8.081} = 9.1879\ \Omega\\ r_{LV} &= \frac{0.021\times290\times1.5921}{48.48} = 0.19998\ \Omega\\ R_p &= r_{HV} + r_{LV}\left(\frac{T_{HV}}{T_{LV}}\right)^2 = 9.1879 + 0.19998\left(\frac{1740}{290}\right)^2 = 16.387\ \Omega\\ \varepsilon_r &= \frac{I_{HV}R_p}{V_{HV}} = \frac{20.2\times16.387}{66000.0} = 0.00502\ \text{p.u.} \end{aligned}

Per unit leakage reactance

Leakage reactance (per unit), with ATAT per limb =35152= 35152 and axial winding length Lc=738.3L_c = 738.3 mm:

εx=2πfμ0ATLc⋅LmtEt(a+b1+b23)=2π(50)(4π×10−7)351520.7383⋅1.812037.931(20+50+503)×10−3=0.0479 p.u.\begin{aligned} \varepsilon_x &= 2\pi f\mu_0\frac{AT}{L_c}\cdot\frac{L_{mt}}{E_t}\left(a + \frac{b_1+b_2}{3}\right)\\ &= 2\pi(50)(4\pi\times10^{-7})\frac{35152}{0.7383}\cdot\frac{1.8120}{37.931}\left(20 + \frac{50+50}{3}\right)\times10^{-3}\\ &= 0.0479\ \text{p.u.} \end{aligned}

(iv) Per unit regulation at 0.8 pf lagging

ε=εrcos⁡ϕ+εxsin⁡ϕ=0.00502(0.8)+0.0479(0.600)=0.0327 p.u.=3.27%\begin{aligned} \varepsilon &= \varepsilon_r\cos\phi + \varepsilon_x\sin\phi\\ &= 0.00502(0.8) + 0.0479(0.600) = 0.0327\ \text{p.u.} = 3.27\% \end{aligned}

Answer: core dd = 437 mm; window 305 × 838 mm; frame 1606 × 1854 × 371 mm; εr\varepsilon_r = 0.0050, εx\varepsilon_x = 0.0479 p.u.; regulation ≈ 3.27%.

✓ Answer checked by Claude Sonnet 5.5