- 2074 Chaitra · 10 marks
Hill road earthwork, 0+060 to 0+120
Short answer
Side-hill section formulas using given cross slopes compute cutting and filling areas at each chainage. The transition between chainage 0+090 (cut) and 0+120 (fill) locates zero point 13.85 m from 0+090. Total earthwork: cutting 182.02 m³, filling 69.18 m³.
Calculate the quantity of earthwork for a portion of hill road from following data: Formation width = 10 m in banking and 8 m in cutting, side slope in cutting = 1:1, side slope in filling = 2:1.
| Chainage | Cut depth | Fill height | Transverse slope |
|---|---|---|---|
| 0+060 | 0.5 | - | 10:1 |
| 0+090 | 0.6 | - | 15:1 |
| 0+120 | - | 0.7 | 12:1 |
Given data and assumptions
- Formation width: cutting m, banking m; side slope in cutting , in filling .
- Sections 30 m apart; cutting at 0+060 and 0+090, filling at 0+120.
Method
The ground has a transverse (cross) slope (H:V), so each section is a side-hill section. With centre height (cutting +, filling −) above/below formation level, formation width and side slope :
Here are the horizontal distances of the up-hill and down-hill toes from the centre line, and are the heights of the ground above formation at the toes (formulas for cutting). For a section wholly in filling the roles swap: the down-hill toe is the far one, and , with the filling height and the filling slope. Where the ground line crosses the formation level inside the road width (part cutting, part filling), the cutting and filling areas are found separately from the co-ordinates of the section (toe points from the same intersection equations). Volume between sections = mean area × distance, taken separately for cutting and filling. Where the centre changes from cutting to filling between two sections and one type of area is zero at one end, the change-over point is found by proportion of the centre heights, and that area is taken over its own part of the length only: .
Sectional areas
| Chainage | Centre ht. (m) | Cutting area (m²) | Filling area (m²) |
|---|---|---|---|
| 0+060 | cut 0.50 | 4.455 | 0.000 |
| 0+090 | cut 0.60 | 5.254 | 0.000 |
| 0+120 | fill 0.70 | 0.000 | 8.565 |
Working for one section:
Take chainage 0+060: centre cutting depth m, , m.
- Ground height above formation at the uphill edge m, at the downhill edge m.
- Toe of the side slope on the uphill side at m from the centre line (ground above formation by 1.000 m); downhill toe at m (ground above formation by 0.091 m).
- Area from the co-ordinates of the polygon: cutting m², filling m².
Change-over between 0+090 (wholly in cutting, 0.60 m) and 0+120 (wholly in filling, 0.70 m): the zero point is m from 0+090, leaving m in filling.
- Cutting m³
- Filling m³
Volumes
| Between | Distance (m) | Cutting (m³) | Filling (m³) |
|---|---|---|---|
| 0+060 – 0+090 | 30.0 | 145.64 | 0.00 |
| 0+090 – 0+120 | 30.0 (13.85 cut + 16.15 fill) | 36.38 | 69.18 |
| Total | 60.0 | 182.02 | 69.18 |
Answer: Earthwork in cutting = 182.02 m³; earthwork in filling = 69.18 m³.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hill road earthwork, cutting 4 m / banking 6 m · Estimating and Costing, chapter 6
- Hill road earthwork, chainage 130-280 · Estimating and Costing, chapter 6
- Hill road earthwork, 0-90 m (8 m formation) · Estimating and Costing, chapter 6
- Hill road earthwork, chainage 12-15 · Estimating and Costing, chapter 6
- Hill road earthwork, 0 m to 90 m, 10/8 m widths · Estimating and Costing, chapter 6 · asked 2×
- Hill road earthwork, chainage 0-150 (50 m) · Estimating and Costing, chapter 6
- Cut and fill volume, 20 m formation width · Surveying I, chapter 9
- Earthwork volume, formation 1201.85, 1.65 m depth · Surveying I, chapter 9
- Cutting volume, 120 m, upward slope 1 in 40 · Surveying I, chapter 9 · asked 8×
- Filling volume, 60 m, formation 1281.49 · Surveying I, chapter 9